首页> 外文会议>Conference of the Italian Thermal Machines Engineering Association >Energy, economic and environmental assessments for gas-turbine integration into an existing coal-fired power plant
【24h】

Energy, economic and environmental assessments for gas-turbine integration into an existing coal-fired power plant

机译:燃气轮机集成到现有燃煤电厂的能源,经济和环境评估

获取原文

摘要

The concept of repowering existing power plants has been recently revalued, in the light of the increasing energy needs, combined with the cost and the difficulty in developing new generating capacity. Among technologies for existing steam power plants, feedwater repowering is considered one of the less-intrusive and cost-effective option to expand capacity, improve efficiency and reduce the pollutants emissions. This paper aims to evaluate the effects of feedwater repowering operating conditions on energy, environmental and economic system performances. Considering a 600 MW coal fired power plant as a study case, two feedwater repowering configurations are investigated. In the first case, a simple throttling of high pressure regenerative steam extractions is operated; in the second configuration, the feedwater upstream the boiler inlet is partially preheated using the waste heat of an additional gas turbine. In both cases, a characteristic plane is introduced for comparing energy, economic and environmental performances of feedwater repowering options, at different condenser overloads and fossil boiler modes of operation.
机译:鉴于越来越多的能量需求,最近重新评估了现有电厂的概念,结合成本和开发新的发电能力的困难。在现有蒸汽发电厂的技术中,给水重新权力被认为是扩大容量,提高效率和减少污染物排放的较低侵入性和经济效益的选择之一。本文旨在评估给水重新驱动效果对能源,环境和经济体系表演的影响。考虑到600 MW燃煤发电厂作为研究案例,调查了两种给水重新电力配置。在第一种情况下,操作高压再生蒸汽萃取的简单节流;在第二配置中,使用额外的燃气轮机的废热部分地预热锅炉入口上游的给水。在这两种情况下,在不同的冷凝器过载和化石锅炉运行模式下,引入了特征平面以比较供给水重新汇位选择的能量,经济和环境性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号