【24h】

A SHORT-TERM PRODUCTION SCHEDULING METHODOLOGY FOR OPEN-PIT MINES

机译:开放式矿山短期生产调度方法

获取原文

摘要

A multi-resource multi-stage scheduling methodology is developed to solve short-term open-pit mine production scheduling problems as a generic multi-resource multi-stage scheduling problem. It is modelled using essential characteristics of short-term mining production operations such as drilling, sampling, blasting and excavating under the capacity constraints of mining equipment at each processing stage. Based on an extended disjunctive graph model, a shifting-bottleneck-procedure algorithm is enhanced and applied to obtain feasible short-term open-pit mine production schedules and near-optimal solutions. The proposed methodology and its solution quality are verified and validated using a real mining case study.
机译:开发了一种多资源多阶段调度方法,以解决短期开坑矿山生产调度问题作为通用多资源多级调度问题。它是使用短期挖掘生产操作的基本特征建模,例如在每个处理阶段的采矿设备的容量约束下钻探,取样,爆破和挖掘。基于扩展析取图模型,增强了换档瓶颈过程算法,并应用了可行的短期露天矿山生产计划和近最优解决方案。使用真正的采矿案例研究验证和验证了所提出的方法及其解决方案质量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号