首页> 外文会议>International Symposium on the Applications of Computers and Operations Research in the Minerals Industry >OPEN PIT STRATEGIC IVIINE PLANNING UNDER UNCERTAINTY - ROBUST AND FLEXIBLE PLANS
【24h】

OPEN PIT STRATEGIC IVIINE PLANNING UNDER UNCERTAINTY - ROBUST AND FLEXIBLE PLANS

机译:在不确定性下开放坑战略思想计划 - 强大而灵活的计划

获取原文

摘要

A strategic mine plan is a fundamental part of any mining operation. It must provide a realistic extraction and processing schedule, as well as an accurate measure of the value of the project. There are several challenges to generating a successful strategic mine plan. Most importantly, key input information re-quired for mine planning, such as actual ore grades and market prices, is uncertain in nature, thus a mine plan generated with deterministic data has a very low probability of performing as expected. Traditional mine planning approaches and existing software packages have failed to address uncertainty, which ultimately leads to underperforming and misvalued operations. In this paper we present the first software application that successfully takes into consideration market price uncertainty and generates feasible mine plans, in a timeframe competitive with commercially available software. The methodology presented provides a platform to consider market price uncertainty without an exponential increase in computational cost. By including uncertainty, our solution is able to create robust and flexible mine plans. A robust plan is one that best performs under unstable economic conditions. A flexible plan incorporates Real Options Analysis, allowing to postpone decisions such as expanding capacity, until the uncertainty has been reduced. The software has been tested for this paper in a real 12 million block model, with a mining operation lasting over 50 years, delivering competitive results for deterministic mine plans, increasing expected NPV in 2.4% with robust plans and the expected NPV of a fictitious expansion project in 68% with flexible plans.
机译:战略矿山计划是任何采矿业务的基本部分。它必须提供一个现实的提取和处理计划,以及准确衡量项目的价值。产生成功的战略矿山计划有几个挑战。最重要的是,为矿山规划重新寻求的关键输入信息,例如实际矿石等级和市场价格,本质上是不确定的,因此使用确定性数据产生的矿山计划具有非常低的执行概率。传统的矿山规划方法和现有的软件包未能解决不确定性,最终导致业务不佳,业务不佳。在本文中,我们介绍了成功考虑市场价格不确定性的第一个软件应用程序,并在与市售软件的竞争中竞争中,生成可行的矿山计划。提出的方法提供了一个平台,无法在没有指数增加的计算成本的情况下考虑市场价格不确定性。通过包括不确定性,我们的解决方案能够创建强大而灵活的矿山计划。强大的计划是在不稳定的经济条件下最能表现的计划。灵活的计划包含真实的选项分析,允许推迟诸如扩展容量的决策,直到不确定性降低。该软件已在真正的1200万块模型中为本文进行了测试,矿业运营持续50年,为确定性矿山计划提供竞争力的结果,增加了预期的2.4%,具有强劲的计划和预期的虚拟扩张的预期NPV项目以68%的计划,灵活的计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号