Infra BIM based Real-time Quality Control of Infrastructure Construction Projects

机译:基于INFRA BIM的基础设施建设项目的实时质量控制

获取原文

摘要

The paper introduces a new method for infrastructure construction project quality control, which enables real-time monitoring of project progress and quality. The tradition method for quality control reporting in construction projects is measuring the built surfaces via total station or GNSS rover and then using surveying CAD software to produce cross section images, which show difference between measured points and 3D design surfaces. The cross section images are then printed on paper and stored. This method of reporting requires a lot of manual labour using CAD software, and due to this reports are often created weeks or even months after the construction work has been completed. The delay in quality reporting causes errors and prevents effective communication between the constructor and project owner. In the proposed new method, 3D design surfaces are produced and stored on a central collaboration cloud system. All measurement devices used on the site are integrated to the collaboration cloud via internet connection. Typically, geometric measurements on a construction site can be done by using total stations, GNSS rovers or machine control systems. All measurements made are immediately transferred over the internet to the cloud and automatically compared to designs to find height differences and colour coded based on required tolerances. The measurements are available for viewing and approval on a map display, using regular web-browser on PC or tablet devices. The new method has been tested on several pilot projects in Finland during 2014. Pilot projects have shown the proposed new method to significantly improve project quality reporting speed and provide unprecedented transparency and situation awareness to all actors of the project, resulting in gains in project predictability and profitability.
机译:本文介绍了一种新的基础设施建设项目质量控制方法,可以实时监测项目进度和质量。建筑项目质量控制报告的传统方法是通过全站仪或GNSS流动站测量内置表面,然后使用测量CAD软件产生横截面图像,显示测量点和3D设计表面之间的差异。然后在纸上打印横截面图像并存储。这种报告方法需要许多使用CAD软件的手动劳动力,由于本报告通常在建设工作完成后的几周甚至几个月内。质量报告的延迟导致错误并防止构造函数和项目所有者之间的有效沟通。在提出的新方法中,生产并存储在中央协作云系统上的3D设计表面。站点上使用的所有测量设备通过Internet连接集成到协作云。通常,可以通过使用总站,GNSS Rover或机器控制系统来完成施工现场的几何测量。所有测量都会立即通过互联网转移到云端,并自动与设计相比,以确定基于所需的公差的高度差异和颜色。测量值可用于在PC或平板电脑设备上使用常规Web浏览器在地图显示上查看和批准。 2014年芬兰的几个试点项目测试了新方法。试点项目已经显示了提议的新方法,以显着提高项目质量报告速度,并为项目的所有行动者提供前所未有的透明度和情况,导致项目可预测性获得和盈利能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号