首页> 外文会议>International Workshop on Hydraulic Equipment and Support Systems for Mining >IEC61850-Based Analysis of Coal Mine Ground Transformer Substation Integrated Automation Communication System
【24h】

IEC61850-Based Analysis of Coal Mine Ground Transformer Substation Integrated Automation Communication System

机译:基于IEC61850的煤矿地面变电站分析综合自动化通信系统

获取原文

摘要

Places of importance of coal mine ground transformer substation in mine electric power supply, according to this article the IEC61850 standard, through the analysis of the function of substation secondary equipment, from the structure of integrated substation automation system-oriented, hierarchical and logical interfaces and interoperability focus analysis of IED, making coal mine ground transformer substation integrated automation communication systems tend to be reasonable. This article is intended to point out that the IEC61850 standard application supports peer to peer traffic patterns, GOOSE information transmission mechanisms will be hard to be effective in reducing IED device wiring, greatly simplifies design and experiment of secondary system for engineering application interoperability between different manufacturers when IED provides effective support.
机译:煤矿地面变电站在矿井电力供应中的重要性,根据本文IEC61850标准,通过分析变电站二次设备的功能,从集成的变电站自动化系统导向,分层和逻辑接口的结构IED的互操作性焦点分析,制造煤矿地面变电站综合自动化通信系统往往是合理的。本文旨在指出,IEC61850标准应用程序支持对等流量模式的对等体,磁鹅信息传输机制在减少IED设备布线方面将很难有效,大大简化了不同制造商之间工程应用互操作性的二级系统的设计和实验当IED提供有效的支持时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号