首页> 外文会议>Water Environment Federation annual technical exhibition and conference >Development of Productivity Standards For Collection Systems Maintenance Activities
【24h】

Development of Productivity Standards For Collection Systems Maintenance Activities

机译:开发收集系统维护活动的生产力标准

获取原文

摘要

The wastewater and stormwater collection system in the City of Edmonton Alberta Canada serves a population of 626,000 and services an area of approximately 700 km~2 (270 square miles). Drainage Services of the Asset Management and Public Works Department is responsible for the management of the wastewater and stormwater infrastructure in the City of Edmonton. The collection system consists of 4,600 km (2900 miles) of pipe, 56,000 manholes, 47,000 catchbasins, 42 stormwater management ponds and 62 pumping stations. The Drainage Operations Section maintains the collection system including all inspection, cleaning and repair activities. Following an audit conducted by the City Auditor’s Office in 2000, it was concluded that work crew efficiency could be improved and that substantiated productivity standards were required for the various maintenance activities. The productivity levels in use at the time of the audit resulted from historical information that had accumulated over the years and could not be supported by known industrial engineering principles. Drainage Operations accepted the Auditor’s recommendations to develop and implement engineered productivity standards, to improve the efficiency of crews performing maintenance activities. In November 2001 a contract to develop the required productivity standards was awarded to the Department of Civil and Environmental Engineering, University of Alberta, Canada. This paper presents the methodology used to develop the engineered productivity standards and improved work methods for crews performing collection system maintenance activities.
机译:埃德蒙顿市埃尔伯塔省艾伯塔省市的废水和雨水收集系统服务于626,000人,服务面积约700公里〜2(270平方英里)。资产管理和公共工程署的排水服务负责管理埃德蒙顿市的废水和雨水基础设施。收集系统由4,600公里(2900英里)的管道,56,000公里,56,000米,47,000辆捕捞池,42个雨水管理池塘和62个泵站。排水操作部分维护收集系统,包括所有检查,清洁和维修活动。在2000年城市审计办公室进行的审计后,得出结论,可以提高工作人员效率,各种维护活动需要证实的生产力标准。审计时间使用的生产率水平由多年来积累的历史信息产生,并且无法通过已知的工业工程原则来支持。排水作业已接受审计师的建议,以制定和实施工程生产力标准,以提高船员执行维护活动的效率。 2001年11月,加拿大阿尔伯塔大学的民事和环境工程系颁发了制定所需生产率标准的合同。本文介绍了用于开发工程生产力标准的方法,以及用于执行收集系统维护活动的人员的改进工作方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号