HANDDL 3D SEISMIC ACQUISITION - CHALLENGING SEISMIC ACQUISITION IN THE MAHAKAM DELTA TRANSITION ZONE

机译:Handdl 3D地震习得 - 挑战Mahakam Delta过渡区的地震习得

获取原文

摘要

Handil field has produced oil and gas for over 40 years. Until 2011 the area had never been fully covered by a 3D survey. A previous attempt in 1999 (Kerbau3D) was stopped because of societal issues. A 3D seismic survey (91.22 sq.km) was acquired in Q3-Q4 2011 to better delineate channeling shallow reservoirs, improve structural imaging of the field, understand oil in place repartition and help to define the drilling strategy. To properly image the reservoir interval ranging from 600m to 2500m, a high density data set was needed over a risky and restricted area. A high tech approach to acquisition and flawless application of HSE standards was essential. Only PT Elnusa - in joint venture with CGGV - accepted to bid for this hazardous project. Issues related to procurement and Forestry Permit consent led to dramatic delays in commencement date (initial 1 st Shot planned Q3 2010-realized Q3 2011). The Handil 3D seismic survey, located in a transition environment, presented many operational challenges; wild life, strong tidal current, protected forest, fish/prawn farms, hydrocarbon field infrastructures and highly populated areas. Other activities included fishing, dredging, coal barge and large ship traffic in main channels added to the challenges. In addition, producing field activities were quite significant with over 1200 well interventions and 3 new wells drilled during the survey. Despite the challenges faced in the Handil 3D seismic survey, the program was executed with no recordable societal issues and no severe injuries. Lessons learnt during previous TZ acquisitions were applied to the benefit of Handil 3D and many innovative techniques were successfully tested with the Contractor. Despite the difficult environmental, societal and industrial challenges, Handil 3D was a great success in terms of Management, Coordination, Data Quality and HSE performances.
机译:HINEION FIELD在40多年内生产出油气。直到2011年,该地区从未完全被3D调查所覆盖。由于社会问题,1999年(Kerbau3D)的先前尝试被停止。在2011年Q3-Q4中获得了3D地震调查(91.22平方SQ.km),以更好地描绘通道浅储层,改善现场的结构成像,了解石油的代价,并有助于定义钻探策略。为了将储层间隔置于600米至2500m的储层间隔,需要在危险和限制区域上进行高密度数据集。高科技采购和完美应用HSE标准的方法至关重要。只有PT Elnusa - 在CGGV中的合资企业 - 接受了这个危险项目的出价。与采购和林业许可证有关的问题,同意导致开始日期的戏剧性延误(2010年第1季度第三季度计划第三季度第三季度)。在过渡环境中的HING HID抗震测量呈现出许多操作挑战;野生寿命,强潮流,受保护的森林,鱼类/虾农场,碳氢化合物场基础设施和高度人口稠密的地区。其他活动包括捕鱼,疏浚,煤炭驳船和主要渠道的大型船舶交通增加了挑战。此外,在调查期间,生产现场活动与超过1200井干预措施和3种新井。尽管HINGIL 3D地震调查面临的挑战,但该计划是没有可记录的社会问题和严重伤害的损失。在先前的TZ收购期间了解的经验教训是应用于HINGIL 3D的好处,并且许多创新技术与承包商成功测试过。尽管环境,社会和产业挑战困难,但HINEIL 3D在管理,协调,数据质量和HSE表演方面取得了巨大成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号