SAND CONTROL AND MANAGEMENT AT LAGAN GAS FIELD, OPTIMIZING WELLHEAD DE-SANDER

机译:拉加天然气场的沙子控制和管理,优化井口德砂光

获取原文

摘要

Lagan is a Medco E&P Indonesia gas field which has 30 wells and produces from 20 different sand layers separated by three faults. On November 2009, after 24 years production lifetime, there was an indication of sand being produced at this field, since sand accumulation was found inside the production separator, and a considerable amount of surface control equipment was being eroded due to sand abrasion. Since Lagan field produces up to 36 MMSCFD, a major contribution, sand control and management were urgently needed to maintain operational reliability. The initial challenge of applying sand control at Lagan field was to identify which wells and which sand layers caused the sand production. To meet this challenge, four wellhead de-sanders were installed at four different wells, all of which produce from different sand layers. By installing these de-sanders, sand layers that contributed to sand production could be identified and follow-up action could be carried out. By considering several aspects, such as the urgent need to accelerate the application of sand control, poor well accessibility and rig mobility, and cost- and application effectiveness, wellhead de-sander was finally chosen as the most suitable sand control technique for this field. The design and fabrication of the wellhead de-sander was completely home-made and continuously improved and modified to enhance the quality and quantity of the sand trapping. After one year's application, wellhead de-sander has proven its effectiveness by reducing the amount of sand carried out to Lagan station from 20 liters/day to 2 liters/day. This means a reduction in production separator downtime for sand clean-up from 3-5 stoppages a day down to 1 stoppage every 2 days, a reduction in maintenance and repair of surface control equipment to zero cases per year, and a total saving of up to USD 340.000.
机译:拉加是一款Medco E&P印度尼西亚气体领域,拥有30个井,并产生由三个故障分开的20种不同的砂层。 2009年11月,在生产寿命24年后,在该领域产生了砂的指示,因为在生产分离器内部发现砂积聚,并且由于砂磨损,相当大量的表面控制设备被侵蚀。由于拉加领域高达36 MMSCFD,因此迫切需要进行主要的贡献,防抱道和管理来维持运营可靠性。在拉加田施加砂防治的初步挑战是识别哪个井和砂层引起的砂层生产。为满足这一挑战,四个井口脱砂器安装在四个不同的井中,所有这些都是从不同的砂层产生的。通过安装这些脱砂器,可以识别出造成砂生产的砂层,并且可以进行随访。通过考虑若干方面,如迫切需要加速砂控制的应用,良好的良好可接近性和钻机流动性,以及成本和应用有效性,最终选择了井口脱砂器作为该领域的最合适的砂控制技术。井口脱砂器的设计和制造是完全自制的,不断改进和修改,以增强砂捕获的质量和数量。在一年的申请之后,井口拆塑者通过减少20升/日至2升/天的拉加站进行的沙子数量来证明其有效性。这意味着生产分离器停机时间减少,用于每2天每天3-5个停工时间从3-5个停机停止,降低表面控制设备的维护和修理到每年零例,并全部节省到340.000美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号