首页> 外文会议>AMSAT-NA annual meeting >Lessons Learned at LEO: Implications for Future AMSAT-NA Projects
【24h】

Lessons Learned at LEO: Implications for Future AMSAT-NA Projects

机译:在Leo的经验教训:对未来AMSAT-NA项目的影响

获取原文

摘要

AMSAT-NA has a long, mostly successful tradition of designing, building and flyingLEO spacecraft, beginning in 1970 with the launch of OSCAR 5, and continuing throughto the construction and deployment of Suitsat-1 in 2006. Along the way, the organizationhas learned many important, and sometimes painful, lessons about the business ofspaceflight. This paper will attempt to record some of the author’s observations,experiences and conclusions based primarily on experiences with AO-7, AO-16, and AO-51, but also other satellites in the amateur service. It is the author’s desire that this paperalso serve as a beginning to a more formal codification of lessons learned, and documentAMSAT’s institutional knowledge for incorporation into future spacecraft and missions.Corrections, clarifications, and comments are of course welcome.
机译:Amsat-Na拥有长长,主要是设计,建筑和飞行的传统Leo SpaceCraft,从1970年开始发射奥斯卡5,并继续通过2006年绥茨-1的建设与部署。沿途,本组织已经学到了很多重要的,有时痛苦,关于业务的课程航天。本文将尝试记录一些作者的观察,主要基于AO-7,AO-16和AO-的经验和结论51,但也在业余服务中的其他卫星。这是作者希望本文的愿望还可以作为更多正式编纂的经验教训,并记录AMSAT对未来航天器和任务融入的制度知识。惩教,澄清和评论当然欢迎。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号