首页> 外文会议>World Mining Congress and Exposition >OPTIMIZATION OF FRAME-BOLT SUPPORT IN THE DEVELOPMENT WORKINGS, USING COMPUTER MODELING METHOD
【24h】

OPTIMIZATION OF FRAME-BOLT SUPPORT IN THE DEVELOPMENT WORKINGS, USING COMPUTER MODELING METHOD

机译:利用计算机建模方法优化开发工作中的框架螺栓支持

获取原文

摘要

Substantiation is given to spatial geomechanical model of a thin-seam weak rocks massif around bedded development working, taking into account finite-element plotting of real geometrical parameters of frame and bolt supports, foot bearing, lagging and support area with corresponding conditions of their contact and real mechanical characteristics. During performance of the work's basic aim - reduction of the support metal content in the development workings and working hours for its installation - the analysis of multi-variants calculations of vertical, horizontal and general (combinative) stresses was conducted and also near-the-contour rock massif dislocations and bearing elements of frame and bolt supports with three variants of their constructive differences: absence and presence of the bolts in a mine working walls, and in the third variant the wall bolts were being connected with the frame props by mechanical links into single load-bearing construction that provided metal-content reduction of the combined support by 30% due to frame support special profile SVP-27 change to SVP-19.
机译:在卧床开发工作周围的薄煤层弱岩体的空间地质力学模型中给予实质性,考虑到框架和螺栓支撑,脚轴承,滞后和支撑区域的实际几何参数的有限元绘制,具有相应的接触条件和真正的机械特性。在工作的基本目标的表现中,减少了开发工作中的支持金属含量和其安装的工作时间 - 对垂直,水平和一般(组合)应力的多变体计算的分析以及附近 - 轮廓岩体脱位和框架和螺栓的轴承元件用其建设性差异的三个变体支持:在矿井工作壁中的缺失和螺栓存在,并且在第三变型中,壁螺栓通过机械链接与框架道具连接进入单一承重结构,由于框架支持特殊简介SVP-27由于框架支持特殊轮廓SVP-27而提供30%的金属含量降低30%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号