首页> 外文会议>European conference on soil mechanics and geotechnical engineering >Design for upgrading of tailing dam Toranica - Kriva Palanka in complex geotechnical and hydrological conditions
【24h】

Design for upgrading of tailing dam Toranica - Kriva Palanka in complex geotechnical and hydrological conditions

机译:尾坝武装大坝 - Kriva Palanka在复杂的地际和水文条件下的设计设计

获取原文

摘要

This paper deals with stress-strain and stability analysis of tailing dam Toranica - Kriva Palanka for specific stages of construction. In the technological concept of the mine for lead and zinc Toranica - Kriva Palanka (north-east of Republic of Macedonia), a tailing dam for disposal of flotation barren soil which remains after the processing of the mine material had been constructed. This tailing dam exists in the past 20 years. On the upstream side there is an earthfill retention dam for diversion of river Kriva Reka into drainage tunnel. The tailing dam is on the down stream side made by fine sand and silt as products of flotation process. The works in the mine Toranica had been stopped for some years. Stress-strain and stability analysis has been made for the existing conditions of the tailing dam and for the design conditions with upgrading of the tailing dam. The crucial parameter was defining of the need of the drainage blanket to the toe of the down stream slope of tailing dam. The calculations have been carried out by finite element method using geotechnical software package PLAXIS and by limit equilibrium method using software package GGU Stability.
机译:本文涉及尾坝Toranica - Kriva Palanka的应力 - 应变和稳定性分析,用于特定施工阶段。在矿业铅和锌的技术概念中 - Kriva Palanka(马其顿共和国东北部),一个尾矿大坝,用于处理矿山材料的加工后仍然存在的浮选贫瘠土。这种拖尾的大坝在过去的20年里存在。在上游侧,有一个土地填埋水坝,用于将河流雷卡转移到排水隧道中。尾巴大坝在沿着细砂和淤泥作为浮选过程的产品制成的下游侧。矿山的作品已经停止了几年。已经为拖尾大坝的现有条件和尾矿坝升级的设计条件进行了应力 - 应变和稳定性分析。关键参数在定义排水毯对尾坝下游坡的脚趾的需要。通过使用岩土软件包PLAXIS的有限元方法和使用软件包GGU稳定性的限制平衡方法进行了计算。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号