Investigation tunnels Aicha-Mauls at Brenner Base Tunnel - progress of works and results

机译:调查隧道Aicha-Mauls在Brenner Base Tunnel - 作品的进步和结果

获取原文

摘要

The Brenner Base Tunnel is an indispensable element of the trans-border European priority scheme TEN Project No. 1 comprising a roughly 2,200 km long high-speed railway route between Berlin/Germany and Palermo/Italy. According to the latest planning the Brenner Base Tunnel will be 55 km long, including the directly following deviation tunnel of Innsbruck the entire tunnel construction will be 62,7 km long and hence the longest tunnel of the world. Between 2007 and 2010 two investigation tunnels, Aicha and Mauls, were build. Their construction is an integral part of the safety, maintenance and dewatering concept. The investigation tunnel Mauls will work as an infrastructure element during the main tunnel construction phase, and after that as a service and rescue tunnel. With a clear section of 100 m~2 the driving runs in NATM on a length of 1.8 km within the hard rock of the Brixen granite. In a further section the tunnel runs on a length of 0.5 km towards the Periadriatic Seam in order to construct the cavern for the runnel driving machine of Aicha ending there. In the investigation tunnel Aicha the first 150 m were constructed in NATM and from that point up to the scheduled end of the driving on a length of 10,250 m with a double-shield tunnel driving machine (diameter 6 m). Results of the investigation tunnels and conclusions for the construction of the Brenner Base Tunnels will be presented in the report.
机译:Brenner Base Tunnel是跨境欧洲优先计划的不可或缺的元素,包括柏林/德国和巴勒莫/意大利的大约2,200公里的高速铁路路线。根据最新规划,Brenner基地隧道将长55公里,包括直接追随因斯布鲁克的偏差隧道整个隧道建设将长62,7公里,因此是世界上最长的隧道。 2007年至2010年间两次调查隧道,Aicha和Mauls,是建立的。他们的建筑是安全,维护和脱水概念的组成部分。调查隧道MAULS将作为基础设施元素在主隧道施工阶段,之后作为服务和救援隧道。清晰的部分为100米〜2,驾驶在Natm中运行,在Brixen Granite的硬岩内的长度为1.8公里。在另一个部分中,隧道朝向围绕围绕围绕围绕围绕围缝的长度延伸,以构建朝向那里的AICHA的逃离机的洞穴。在调查隧道AICHA中,前150米在NATM中构建,并且从该点到达驾驶的预定端,长度为10,250米,双屏蔽隧道驱动机(直径6米)。报告中提出了调查隧道的结果和建造Brenner Base隧道的结论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号