Investigation tunnels Aicha-Mauls at Brenner Base Tunnel - progress of works and results

机译:布伦纳基地隧道的调查隧道Aicha-Mauls-工程进度和结果

获取原文

摘要

The Brenner Base Tunnel is an indispensable element of the trans-border European priority scheme TEN Project No. 1 comprising a roughly 2,200 km long high-speed railway route between Berlin/Germany and Palermo/Italy. According to the latest planning the Brenner Base Tunnel will be 55 km long, including the directly following deviation tunnel of Innsbruck the entire tunnel construction will be 62,7 km long and hence the longest tunnel of the world. Between 2007 and 2010 two investigation tunnels, Aicha and Mauls, were build. Their construction is an integral part of the safety, maintenance and dewatering concept. The investigation tunnel Mauls will work as an infrastructure element during the main tunnel construction phase, and after that as a service and rescue tunnel. With a clear section of 100 m~2 the driving runs in NATM on a length of 1.8 km within the hard rock of the Brixen granite. In a further section the tunnel runs on a length of 0.5 km towards the Periadriatic Seam in order to construct the cavern for the runnel driving machine of Aicha ending there. In the investigation tunnel Aicha the first 150 m were constructed in NATM and from that point up to the scheduled end of the driving on a length of 10,250 m with a double-shield tunnel driving machine (diameter 6 m). Results of the investigation tunnels and conclusions for the construction of the Brenner Base Tunnels will be presented in the report.
机译:布伦纳基础隧道是欧洲跨境优先计划TEN项目1的必不可少的组成部分,该项目包括从柏林/德国到巴勒莫/意大利的大约2200公里长的高速铁路路线。根据最新规划,布伦纳基础隧道将长55公里,包括因斯布鲁克紧随其后的偏斜隧道,整个隧道建设将长62.7公里,因此是世界上最长的隧道。在2007年至2010年之间,修建了两条调查隧道Aicha和Mauls。它们的结构是安全,维护和脱水概念不可或缺的一部分。勘察隧道Mauls将在主要隧道建设阶段充当基础设施元素,此后将作为服务和救援隧道。在100 m〜2的净空区域中,驱动器在Brixen花岗岩的硬岩中以1.8 km的长度在NATM中运行。在另一部分中,该隧道朝着Periadriatic煤层延伸0.5公里,以便为Aicha的隧道掘进机建造一个通往该处的洞穴。在调查隧道Aicha中,最初的150 m是在NATM中建造的,从那时起直至预定行程,使用双盾隧道掘进机(直径6 m)在10,250 m的长度上。报告中将介绍调查隧道的结果和布伦纳基础隧道的建设结论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号