PHX Sky Train Positioned for Success

机译:PHX Sky火车定位成功

获取原文

摘要

After several years of planning and design work related to a landside APM system, the City of Phoenix officially began construction of the Sky Harbor International Airport PHX Sky Train project facilities in April 2009 and awarded the train system supplier contract in June 2009. The first stage of the PHX Sky Train system will replace the existing bus connection between the Metro Light Rail station at 44th Street and Washington, the East Economy Parking structure and Terminal 4. Future stages will connect to existing and planned terminals to the west, a planned ground transportation center and the new Rental Car Center. Under an accelerated schedule, the first stage of the PHX Sky Train is scheduled to begin carrying passengers by the spring of 2013. Central to the planning process for PHX Sky Train was the City's goal to provide a state of the art transportation system that would link all of the airport facilities to regional transit to help reduce traffic congestion within the terminal core. The PHX Sky Train project is timely in accomplishing this goal given that the first segment of the METRO light rail system that links downtown Phoenix, the airport and Tempe began operation in December 2008. Upon completion of the entire system, the PHX Sky Train system length will be about 8 km (5 miles) with up to seven stations. The system will serve a total daily ridership of 96,000 passengers and a total annual ridership of 35 million passengers and will operate 24 hours a day with peak headways of less than three minutes. This paper focuses on the unique challenges and opportunities related to the PHX Sky Train system planning and procurement activities, as well as provides an overview of the progress of the system implementation and construction activities.
机译:经过几年的规划和设计工作与地面APM系统相关,凤凰城市于2009年4月正式开始建设天空港国际机场PHX Sky Train项目设施,并于2009年6月颁发了火车系统供应商合同。第一阶段PHX Sky Trail系统将取代44街和华盛顿地铁轻轨站之间现有的巴士连接,东部经济停车场结构和码头4.未来阶段将连接到西部的现有和计划的终端,计划地面运输中心和新的租赁车中心。在加速时间表下,PHX天空列车的第一阶段计划于2013年春季开始搬运乘客。PHX Sky Train的规划过程中的核心是该市的目标,可以提供将联系的艺术运输系统的目标所有机场设施到区域交通,有助于减少终端核心内的交通拥堵。 PHX Sky Train项目在2008年12月开始运营的地铁轻轨系统的第一部门的Metro Light Rail系统的第一部分开始完成这一目标。在完成整个系统后,PHX天空列车系统长度将大约8公里(5英里),最多七个站。该系统将占总每日乘客96,000名乘客,每年乘客3500万乘客,每天24小时运行,峰值高于3分钟。本文重点介绍了与PHX Sky Train系统规划和采购活动相关的独特挑战和机会,并概述了系统实施和施工活动的进展情况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号