首页> 外文会议>International Waste Management and Landfill Symposium >POTENTIAL GAS PRODUCTION IN THE PLANNED ANAEROBIC DIGESTION TREATMENT PLANT IN TUSCANY: BMP ANALYSIS OF ORGANIC FRACTION AND SLUDGE FROM SEPTIC TANKS
【24h】

POTENTIAL GAS PRODUCTION IN THE PLANNED ANAEROBIC DIGESTION TREATMENT PLANT IN TUSCANY: BMP ANALYSIS OF ORGANIC FRACTION AND SLUDGE FROM SEPTIC TANKS

机译:托斯卡纳计划厌氧消化处理厂的潜在天然气生产:腐败罐的有机分数和污泥的BMP分析

获取原文

摘要

This work is a collaboration between ASM S.p.a., waste management company in Prato (Tuscany), and the Department of Industrial Engineering of the University of Florence. ASM has planned to build a new anaerobic digestion plant for the treatment of about 60,000 t of Municipal Solid Waste MSW). In particular, the plant will work with both source sorted biodegradable fraction and mechanical sorted organic fraction from residual MSW. It has been evaluated the possibility also to treat sludge from septic tanks.
机译:这项工作是普拉托(托斯卡纳)的ASM S.P.A.,废物管理公司的合作,以及佛罗伦萨大学工业工程系。 ASM计划为治疗约60,000吨市政固体废物MSW构建新的厌氧消化厂。特别是,该植物将与源分类的可生物降解的分数和来自残留MSW的机械分选的有机级分。已经评估了从化粪池处理污泥的可能性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号