首页> 外文会议>International Conference on Environmental Science and Technology >ADVANCED CONTROL SYSTEM OF ACTIVATED SLUDGE PROCESSES USING IN-SITU AMMONIUM AND NITRATE PROBES
【24h】

ADVANCED CONTROL SYSTEM OF ACTIVATED SLUDGE PROCESSES USING IN-SITU AMMONIUM AND NITRATE PROBES

机译:使用原位铵和硝酸盐探针的活性污泥工艺的先进控制系统

获取原文

摘要

Nowadays, effluent quality of Wastewater Treatment Plants (WWTP) has to meet stringent environmental regulations. The aim of this study was to assess the dynamic control efficiency of nitrification and denitrification process using a pilot-scale intermittently aerated and fed bio-reactor (IAFB). On-line monitoring of nitrification and denitrification processes was achieved using in situ ammonium and nitrate probes and a programmable control system. The aeration requirements for organic carbon and ammonia oxidation were controlled by setting ammonia effluent concentration at 2, 3 or 4 mg L~(-1) NH_4~+-N. Denitrification phase length was set by reaching the lowest nitrate effluent concentration (1 mg L~(-1) NO_3~--N).The average nitrification time was 52 and 21 min for the oxidation of 6 and 3 mg L~(-1) NH_4~+-N, respectively. The denitrification period needed for the reduction of 6 and 11 mg L~(-1) NO_3~--N was 7 and 71 min, respectively. Two distinct nitrification rates (Nr), i.e. 0.15 ± 0.05 and 0.08 ± 0.03 g g~(-1) VSS d~(-1), were detected, depending on the initial ammonium concentration of the influent. Three denitrification rates (DNr) were observed during anoxic phase, which were equal to 0.43 ± 0.09, 0.09 ± 0.02 and 0.04 ± 0.02 g NO_3~--N g~(-1) VSS d~(-1). The control strategy of the activated sludge process resulted in COD, BOD, TKN, NH_4~+-N and NO_3~--N removal efficiencies of 90, 94, 89, 94 and 99%, respectively.
机译:如今,废水处理厂(WWTP)的污水质量必须满足严格的环境法规。本研究的目的是利用间歇性气化和喂养生物反应器(IAFB)的试验规模来评估硝化和脱氮过程的动态控制效率。使用原位铵和硝酸铵探针和可编程控制系统实现了硝化和脱氮过程的在线监测。通过在2,3或4mg L〜(-1)NH_4〜+ -N的氨流出浓度下,控制有机碳和氨氧化的曝气要求。通过达到最低硝酸盐流出浓度(1mg L〜(-1)NO_3〜-N)来设定脱氮相长度。氧化的平均硝化时间为6和3mg L〜(-1 )NH_4〜+ -N分别。减少6和11mg L〜(-1)NO_3〜-N所需的脱硝期分别为7和71分钟。检测两个不同的硝化速率(NR),即0.15±0.05和0.08±0.03g G〜(1)VSS D〜(-1),这取决于流入的初始氨浓度。在缺氧相期间观察到三种脱氮速率(DNR),其等于0.43±0.09,0.09±0.02和0.04±0.02g NO_3〜-N G〜(-1)VSS D〜(-1)。活性污泥过程的控制策略导致COD,BOD,TKN,NH_4〜+ -N和NO_3〜-N分别去除90,94,89,94和99%的清除效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号