首页> 外文会议>International Conference on Power Electronics and Drive Systems >A Load Management Method to Reduce the Power Energy Cost for Glass Industry
【24h】

A Load Management Method to Reduce the Power Energy Cost for Glass Industry

机译:一种减少玻璃行业电能成本的负荷管理方法

获取原文

摘要

The aim of this research is to study the power cost reduction of glass manufacturing process for industrial customers and to relieve the crisis of electricity shortage during summer peak time period through load management (LM). This research can also provide decision makers and managers with useful LM strategies to use as guidance. The results indicate that local glass industry is highly willing to participate in the development of LM strategies. As the running time of a ball mill is adjusted to the preferential rates of time of use (TOU), industry customers can save a certain amount of electricity cost.
机译:本研究的目的是研究工业客户的玻璃制造过程的电力成本降低,并通过负载管理(LM)在夏季峰值时间段内缓解电力短缺危机。该研究还可以为决策者和管理人员提供有用的LM策略,以用作指导。结果表明,当地玻璃行业普遍愿意参与LM策略的发展。随着球磨机的运行时间调整为优先使用时间(TOU),行业客户可以节省一定量的电力成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号