首页> 外文会议>European Association of Geoscientists Engineers Conference Exhibition >Brightwater B. Trial in Salema Field, Campos Basin, Brazil (SPE-131299)
【24h】

Brightwater B. Trial in Salema Field, Campos Basin, Brazil (SPE-131299)

机译:Brightwater B.萨尔玛野外审判,巴西坎多斯盆地(SPE-131299)

获取原文

摘要

This paper describes the maturation work, execution, monitoring and first results of the first Brightwater trial in Brazil (which is also the first for Shell worldwide). We will discuss the lab work (core tests, sand-pack tests...), tracer tests results and reservoir simulation studies that lead to the decision to the field trial. The offshore set-up and bright water pumping will be describe briefly. Finally the monitoring techniques (ions monitoring, fall-off tests...) will be along with the first results (positive so far).
机译:本文介绍了巴西第一个亮水试验的成熟工作,执行,监测和第一款结果(这也是全球壳牌的第一个)。我们将讨论实验室工作(核心测试,砂包测试......),示踪剂测试结果和水库模拟研究,导致现场试验的决定。将简要描述海上设置和明亮的水泵。最后,监测技术(离子监测,跌倒测试......)将与第一个结果一起(到目前为止正面)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号