首页> 外文会议>International symposium on bridge and structural engineering >The Refurbishing of the Nibelungen Bridge Worms, Germany
【24h】

The Refurbishing of the Nibelungen Bridge Worms, Germany

机译:德国硝化桥蠕虫的翻新

获取原文

摘要

If the Nibelungen Bridge (Fig.1), opened on traffic in 1953, is forced into the corset of present-day technical regulations, then it loses its adequate load-bearing capacity. However, if one follows Finsterwalder’s ingenious design idea of 1930 and enriches it with the ideal of fully prestressing, a careful strengthening will result with just a few external tendons laid carefully inside the two hollow boxes and an allowance for shear approach that will enable the structure to cope with today’s live loads. Apart from the replacement of the tiebacks in one land pier, the further defects are due to the greatly changed, aggressive environmental conditions and the effect of de-icing salt that could not be foreseen in 1953. Knowledge of construction history also helped to preserve this masterpiece of civil engineering without having to make any concessions with regards to its use.
机译:如果在1953年开放的Nibelungen Bridge(图1),则被迫进入现今技术法规的紧身胸衣,然后它失去了其充分承载能力。但是,如果芬特瓦尔德的巧妙设计思想遵循1930年,并以完全预应力的理想丰富,请仔细加强将在两个空心盒内仔细铺设一些外部肌腱,并占据剪切方法的额度应对今天的活载。除了在一个土地码头中取代重置外,还有一些缺陷是由于1953年无法预见的脱冰盐的大大变化,侵蚀性的环境条件和脱冰盐的影响。施工史也有助于保存这一点土木工程的杰作,而无需在其使用方面进行任何让步。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号