The Refurbishing of the Nibelungen Bridge Worms, Germany

机译:尼伯龙根桥蠕虫的翻新工程,德国

获取原文
获取原文并翻译 | 示例

摘要

If the Nibelungen Bridge (Fig.1), opened on traffic in 1953, is forced into the corset of present-dayrntechnical regulations, then it loses its adequate load-bearing capacity. However, if one followsrnFinsterwalder’s ingenious design idea of 1930 and enrichesrnit with the ideal of fully prestressing, a carefulrnstrengthening will result with just a few external tendonsrnlaid carefully inside the two hollow boxes and anrnallowance for shear approach that will enable the structurernto cope with today’s live loads. Apart from the replacementrnof the tiebacks in one land pier, the further defects are duernto the greatly changed, aggressive environmentalrnconditions and the effect of de-icing salt that could not bernforeseen in 1953.rnKnowledge of construction history also helped to preservernthis masterpiece of civil engineering without having tornmake any concessions with regards to its use.
机译:如果1953年通车的Nibelungen桥(图1)被迫进入当今技术法规的束腰,那么它将失去足够的承重能力。但是,如果遵循芬斯特瓦尔德(Finsterwalder)1930年的巧妙设计思想并充分施加预应力的理想思想,则只有将少量外部筋腱仔细地布置在两个空心箱体内并避免剪力,才能使结构得到谨慎处理,从而使结构能够应对当今的活荷载。 。除了在一个陆地码头上更换系索外,还存在其他缺陷,这是由于发生了巨大变化,侵略性环境条件以及除冰盐的效果所致(这是1953年无法预见的)。施工历史的知识也有助于保护这一土木工程杰作在使用方面有所妥协。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号