首页> 外文会议>IFIP TC 8 international conference on e-government, e-services >ICT-Based Improvement of Construction Procurement Process
【24h】

ICT-Based Improvement of Construction Procurement Process

机译:基于ICT的建筑采购过程改进

获取原文

摘要

The research by Maliranta and Rouvinen based on the Finnish industrial statistics confirms that the productivity improvements in ICT services in firms correlate to organizational and process changes. These results implied a further question: Which types of process changes create the most beneficial productivity improvements in different environments? In this paper we apply the Three Viewpoint Method (3VPM) approach, originally developed for the productivity analysis of process changes, to analyze the improvement of the construction procurement process of a large Scandinavian construction company when an IT system for procurement was taken into use in the Finnish offices. The analysis revealed that implementing the procurement IT system decreased worker utilization rates and improved the procurement process throughput.
机译:基于芬兰工业统计数据的法拉门塔和Rouvinen的研究证实,企业ICT服务的生产力改进与组织和过程变化相关。这些结果暗示了另一个问题:哪种类型的过程变化会在不同环境中创造最有益的生产力提高?在本文中,我们应用了三个观点法(3VPM)方法,最初为过程变化的生产率分析而开发,分析了一家大型斯堪的纳维亚建筑公司建设采购过程的提高,当被采用IT系统进行采用芬兰办事处。该分析显示,实施采购IT系统减少了工人利用率,并改善了采购过程吞吐量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号