首页> 外文会议>International Seminar on Paste and Thickened Tailings >Successful transitioning of a conventional slurry tailings storage facility for central thickened discharge
【24h】

Successful transitioning of a conventional slurry tailings storage facility for central thickened discharge

机译:成功过渡的常规浆料尾矿储存设施,用于中央加厚排放

获取原文

摘要

A copper mine in Australia operated a perimeter discharge tailings storage facility (TSF) for storage of conventional slurried tailings. In response to regional water shortages, the mine installed a high-rate thickener to dewater the tailings. This provided an opportunity to transition the perimeter discharge TSF for central thickened discharge (CTD). To facilitate the transition, an interim TSF was designed for storage of thickened tailings from the newly commissioned thickener, allowing tailings in the existing TSF to undergo a period of drying and consolidation. During deposition in the interim TSF, a retrofit design was prepared for the existing TSF to allow it to receive centrally deposited thickened tailings while optimising water recovery from the TSF. This paper describes details of the retrofit, including geotechnical and water management considerations and optimisation of the storage layout to ultimately form a dual-mounded system for tailings deposition. The dual-mounded layout provides flexibility for cycling of tailings deposition and facilitates perimeter embankment raise construction in phases. The paper describes the design, construction and operational stages of the successful transitioning of the facility.
机译:澳大利亚的铜矿操作了一个周边放电尾矿储存设施(TSF),用于储存常规的浆状尾矿。为了应对区域水资源短缺,矿井安装了高速增稠剂,以脱尾。这为用于中央增厚放电(CTD)过渡的机会过渡到周边放电TSF。为了便于过渡,临时TSF设计用于存储来自新委员会增稠剂的加厚尾矿,允许现有TSF中的尾矿进行干燥和整合时期。在临时TSF中沉积期间,为现有TSF制备改造设计,以使其接收中央沉积的增稠尾矿,同时优化从TSF的水回收。本文介绍了改造的细节,包括岩土和水管理的考虑,以及存储布局的优化,最终形成用于尾矿沉积的双墩系统。双墩布局为尾矿沉积循环提供柔韧性,并促进周边堤防提高阶段的结构。本文介绍了该设施成功过渡的设计,建设和运营阶段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号