Performance of Composite Paste Barricades at Goldcorp Inc., Red Lake Mine, Ontario, Canada

机译:加拿大安大略省红湖矿,红湖矿的复合贴障碍障碍

获取原文
获取外文期刊封面目录资料

摘要

Appropriate strength barricades and fill fences are a necessary component of underhand cut and fill mining operations and sloping operation in general. These important structures are subject to a number of stresses and strains as a result of the deposition, and curing of the backfill material Parametric monitoring of fill fences gives the engineer the required data to predict not only the behaviour of the paste backfill as it is being deposited but also the ability to predict the deformation and eventual failure of the barricade. A study was undertaken to determine the performance of the paste barricades at Goldcorp Inc. 's Red Lake Mine using real time instrumentation to monitor the stresses, strains and deformation of paste and paste barricades during placement. The barricades at the mine are a standardised barricade comprised of 10 cm of shotcrete applied to a rebar skeleton spaced nominally 60 cm apart. In total eight fill barricades were instrumented to determine the behaviour of the paste during the loading. Complementing the eight barricade tests, an instrumented destructive test was carried out to determine the ultimate capacity of the composite barricade. It was determined that the paste backfill behaves as a Rankine-like soil in the initial stages of placement with an average coefficient of lateral earth pressure, Ka, of 0.56. The destructive test determined that the yielding stress of a paste barricade is approximately 100 kPa. The results of the investigation have resulted in operational changes in the placement of paste at the mine.
机译:适当的强度路障和填充围栏是一般的切割和填充挖掘操作和倾斜操作的必要组件。这些重要的结构由于沉积而受到许多应力和应力,并且填充围栏的回填材料参数监测的固化使工程师提供所需的数据,以预测粘贴回填的行为存放,但也能够预测阻塞的变形和最终失败的能力。采取了一项研究,以确定Goldcorp Inc.的红湖矿用实时仪器在放置期间监测浆料和浆料障碍物的应力,菌株和变形的粘贴障碍的表现。矿井的障碍是一个标准化的障碍,包括10厘米的喷射丝网,施加到标称骨架间隔开60厘米的螺旋骨架。总共有八个填充路障被仪器被仪表以确定浆料在装载过程中的行为。补充八个路障测试,进行了仪表破坏性测试以确定复合障碍的最终能力。确定糊状物回填的表现为初始阶段的Quanting-Lib的土壤,其突出的初始阶段具有平均系数的横向接地压力Ka,Ka为0.56。破坏性测试确定浆料障碍物的屈服应力约为100kPa。调查结果导致泥土粘贴的贴片作业变化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号