TOWARDS MODELING LARGE SCALE PROJECT EXECUTION MONITORING - Project Status Model

机译:朝着建模大规模项目执行监控 - 项目状态模型

获取原文

摘要

Software projects are problematic considering their high overruns in terms of execution time and budget. In large scale projects, the monitoring activity is a very difficult task, due to the very complex relation between resources and constraints, and must be based on a well established methodology. The outputs of the monitoring process refer mostly to the current status of the project, which must be reflected as accurate as possible. We propose a model for project status determination. This is a sub-model of a future monitoring model subject of our current research. The project status model not only considers the perspective of the project manager, which defines the macro-universe of the project, but also the perspective of every worker involved in the project, who can be seen as manager of their assigned tasks, which defines the micro-universe of the worker.
机译:考虑到执行时间和预算方面的高超运行,软件项目是有问题的。在大规模项目中,由于资源和约束之间的关系非常复杂,并且必须基于建立的方法,监测活动是一项非常艰巨的任务。监控过程的输出主要指的是项目的当前状态,必须尽可能准确地反映。我们提出了一个项目状态确定的模型。这是我们目前研究的未来监测模型的子模型。项目状态模型不仅考虑了项目经理的角度,该项目经理定义了项目的宏观宇宙,而且还可以看到该项目的每个工人的角度,他们可以被视为分配任务的经理,它定义了工人的微观宇宙。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号