【24h】

Catfish Contractors Vs NYET County Airport Board

机译:鲶鱼承包商与Nyet County机场董事会

获取原文

摘要

AACE International is presenting a mock arbitration patterned after an actual arbitration. Actual facts are presented with names and dates changed to protect identities. In this arbitration, you will be presented with case facts and asked to make a final award. The purpose of this exercise is to allow cost and schedule professionals to become familiar with the arbitration process, to understand legal requirements for proving one’s case, and what it takes to be a qualified expert witness in such cases The facts are fairly simple, straightforward and not really in dispute. However, the primary issue revolves around the concept of reasonableness and engineering judgment. NYET County Airport Board hired Catfish Contractors to build a new airport. The project was relatively small and was not complex to estimate, plan, or execute. During construction a dispute arose concerning the caliche (calcified limestone rock) used in the base courses of the runway. NYET believed that compaction and gradation test results showed material not meeting specification was used by Catfish. Catfish believed that while the gradation tests at the site showed a deviation from the tested and approved offsite material source, that it was close enough and that Owner’s engineer should have used its judgment and allow material be left in place. In the alternative, Catfish sought to add lime to the caliche base courses to solve the problem. This solution was rejected by the engineer as being unreliable. This case became a search for justice for the contractor who thought that the owner and its engineers had impugned contractor’s reputation and the engineer was acting arbitrarily and capriciously. The parties, after the contractor was forced to remove the caliche and replace it with material meeting all specifications, formally arbitrated the dispute using American Arbitration Association rules and procedures. Actual results are presented after the mock arbitration is concluded.
机译:AACE International在实际仲裁后展示了模拟仲裁。实际的事实呈现出名称,日期更改以保护身份。在这项仲裁中,您将以案例事实提出并要求进行最终奖项。本练习的目的是允许成本和安排专业人员熟悉仲裁过程,了解证明一个人的案例的法律要求,以及在这种情况下成为合格的专家证人所预期的事实是相当简单,直截了当的并不是争执。但是,主要问题围绕了合理性和工程判断的概念。 Nyet县机场董事会聘请鲶鱼承包商建造一个新机场。该项目相对较小,估计,计划或执行并不复杂。在建造期间,在跑道的基础课程中使用的Caliche(钙化石灰石岩石)产生争议。 NYET认为,压实和渐变测试结果显示了鲶鱼不使用会议规范。鲶鱼认为,虽然该网站的渐变测试显示了与测试和批准的现场材料源的偏差,但它足够接近,并且所有者的工程师应该使用其判断并允许材料留下材料。在替代方案中,鲶鱼试图向Caliche基础课程添加石灰以解决问题。该解决方案被工程师拒绝,因为不可靠。这种情况成立了对承包商的司法,他们认为所有者和其工程师因承包商的声誉而受到谴责的承包商的声誉,而工程师则作出任意和稳定。缔约方在承包商被迫去除Caliche并用会议所有规格的材料取代它,使用美国仲裁协会规则和程序正式仲裁争议。在仲裁仲裁结束后呈现实际结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号