Nam Theun 2 is a major hydroelectric scheme recently commissioned in Laos. The scheme involves an inter-basin transfer from the Nam Theun River to generate approximately 1000MW of hydro power. Discharge from the power station to the downstream Xe Bang Fai River is via a 27km long diversion channel, 8km of which is riprap lined. In order to satisfy design constraints on both velocity and water level, the channel design considered a wide range of roughness parameters estimated from standard references and previous similar experience. During commissioning however, the hydraulic roughness of the riprap was found to be much smoother than expected, lower than lower bound estimates from standard references. This paper examines the data from the project and in particular the construction methodology in order to draw conclusions in relation to riprap design and roughness prediction. The outcomes will be of great interest to hydraulic design practitioners.
机译:Nam Theun 2是最近在老挝委托的主要水电方案。该方案涉及从Nam Theun River的池间转移,产生大约1000MW的水力发电。从发电站排放到下游XE Bang Fai河流通过27公里的长分流通道,其中8公里是撕裂的。为了满足对速度和水位的设计约束,通道设计被认为是从标准参考和以前类似的经验估计的广泛粗糙度参数。然而,在调试期间,发现撕裂的液压粗糙度比预期的预期更光滑,低于标准参考的下限估计。本文介绍了项目的数据,特别是施工方法,以得出与撤销设计和粗糙度预测相关的结论。结果对液压设计从业者来说是非常感兴趣的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号