首页> 外文会议>IFAC International Symposium on Advanced Control of Chemical Processes >Multi-product Multi-stage Production Planning with Lead Time on a Rolling Horizon Basis
【24h】

Multi-product Multi-stage Production Planning with Lead Time on a Rolling Horizon Basis

机译:多产品多级生产规划,滚动地平线上的换行时间

获取原文

摘要

Responding to a scalable production system in a make-to-order environment requires increased effective decisions. This paper considers challenges brought by lead time existed in a multi-product multi-stage manufacturing system when making a short-term production planning. The order-based production routes enhance the production flexibility, and in the meanwhile complicate the decision-making for each production stage. We define a series of sets to aggregate the production route and then model the problem as a mixed integer linear program (MILP) problem. The model seeks to find optimal production lots with several practical extensions. To efficiently capture the production dynamics induced by the lead times and setup, the production planning is implemented on a rolling horizon basis. The model is divided into several sub-problems as the horizon is rolled forward, of which a fix-and-relax strategy is applied. A study is conducted using data from a real case to evaluate the performance.
机译:在按订单环境中响应可扩展的生产系统需要提高有效决策。本文考虑了在进行短期生产计划时在多产品多阶段制造系统中存在的挑战。基于秩序的生产路线提高了生产灵活性,同时对每个生产阶段的决策复杂化。我们定义了一系列集合来聚合生产路由,然后将问题模拟为混合整数线性程序(MILP)问题。该模型旨在找到具有多个实际扩展的最佳生产批次。为了有效地捕获通过交货时间和设置所引起的生产动力,生产规划在滚动地平线上实施。该模型分为几个子问题,因为地平线向前推出,其中应用了固定和放松的策略。使用来自真实情况的数据进行研究以评估性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号