INTEGRITY OF OLD PIPELINES BURIED IN PETROLEUM PRODUCTS STORAGE TERMINALS

机译:埋藏在石油产品存储码头的老管道的完整性

获取原文
获取外文期刊封面目录资料

摘要

This work aims to present the results obtained from the experience gained through the accomplishment of the inspection with the ultrasonic umbilical pig in a non-piggable internal pipe buried in the Transpetro Storage Terminal in Sao Caetano do Sul, in Sao Paulo, Brazil. The pipeline considered in this work is a line for marine fuel oil, which, because of its high viscosity, must be heated in order to flow. The oil is heated in the terminal by the steam produced in boilers. The heat transfer may occur in a heat exchanger or inside the storage tank, and the pipeline referred is thermally isolated. So that the line could be inspected, it was divided in two parts, one upstream of the pumps (suction), which is a 12-inch line, and the other downstream of the same pumps (discharge), which is a 14-inch line. This work has been developed by Transpetro's Pipeline Operation, Maintenance, Inspection and Safety Departments together, since the planning phase, passing by the job execution and getting to the conclusion. To begin with, the operational liberation of the line had to be agreed between all the departments involved with the PIG inspection, which were mentioned before, and Transpetro's Logistics Department. Once the PIG passage was scheduled, an initial cleaning had to be performed by the Operation Activity. Since this line is non-piggable, the installation of adaptations was necessary. After that, the passage of cleaning PIGs was possible, and the line sections could be enabled. The next step was the inspection of the pipeline with umbilical ultrasonic PIGs. After the passage of these PIGs, the adaptations had to be removed and the pipeline had to be conditioned for the operational return. After this part of the inspection was finished, the verification of the results issued was necessary. Once the theoretical results were available, ditches were opened for correlation inspection and temporary repairs in the most critical points for the operation were applied. The last part of the work consists in an analysis study of technical and economical viability for rehabilitation of the lines.
机译:这项工作旨在展示通过在巴西圣保罗的甲基·帕洛(巴西圣保罗)埋藏在埋藏在埋藏的非猪脐带中的超声波脐猪的经验获得的结果。在这项工作中考虑的管道是用于海洋燃料油的线,由于其高粘度,必须加热以便流动。通过锅炉生产的蒸汽在终端中加热油。传热可以在热交换器或储罐内部发生,并且引用的管道被隔离。因此可以检查该线路,它分为两部分,泵上游(吸力),即12英寸的线,另一个泵(放电)的另一个下游,这是14英寸线。这项工作是由Thanpetro的管道运营,维护,检查和安全部门开发的,自规划阶段以来,通过工作执行并得出结论。首先,必须在涉及猪检验的所有部门之间商定该行的运营解放,以前提到,并佩雷罗的物流部门。一旦猪通道被调度,必须通过操作活动进行初始清洁。由于这条线是不可镀金的,因此需要安装适应性。之后,可以使清洁猪的通过,并且可以使能线路部分。下一步是用脐带超声波检查管道。在这些猪通过后,必须拆除适应性,并将管道调节运营返回。在这部分检查结束后,颁发的结果核实是必要的。一旦提供理论结果,就打开了沟渠,在应用操作中最关键点的相关检查和临时维修。工作的最后一部分包括对技术和经济可行性的分析研究,以便对康复的康复。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号