首页> 外文会议>International Cryogenic Materials Conference >The Relativistic Heavy Ion Collider (RHIC) Refrigerator System at Brookhaven National Laboratory: Phase III of the System Performance and Operations Upgrades for 2006
【24h】

The Relativistic Heavy Ion Collider (RHIC) Refrigerator System at Brookhaven National Laboratory: Phase III of the System Performance and Operations Upgrades for 2006

机译:Brookhaven国家实验室的相对论重离子撞机(RHIC)冰箱系统:2006年系统性能和运营升级的第三阶段

获取原文

摘要

An ongoing program at Brookhaven National Laboratory (BNL) consists of improving the efficiency of the Relativistic Heavy Ion Collider (RHIC) cryogenic system and reducing its power consumption. Phase I and II of the program addressed plant operational improvements and modifications that resulted in substantial operational cost reduction and improved system reliability and stability, and a compressor input power reduction of 2 MW has been demonstrated. Phase III, now under way, consists of plans for further increasing the efficiency of the plant by adding a load "wet" turbo-expander and its associated heat exchangers at the low temperature end of the plant. This additional stage of cooling at the coldest level will further reduce the required compressor flow and therefore compressor power input. This paper presents the results of the plant characterization, as it is operating presently, as well as the results of the plant simulations of the various planned upgrades for the plant. The immediate upgrade includes the changes associated with the load expander. The subsequent upgrade will involve the resizing of expander 5 and 6 to increase their efficiencies. The paper summarizes the expected improvement in the plant efficiency and the overall reduction in the compressor power.
机译:在布鲁克海文国家实验室(BNL)的现行计划包括改善相对论重离子对撞机(RHIC)的低温系统的效率并降低其功耗。相I和方案的第二处理工厂操作改进和导致大量降低运营成本以及改善系统的可靠性和稳定性,和2兆瓦的压缩机输入功率减少已证明修改。阶段III,现在正在进行中,包括计划进一步通过在所述植物的低温端添加负载“湿”涡轮膨胀机和其相关的热交换器增加了设备的效率。在最冷水平的冷却该附加阶段将进一步减少所需的压缩机流动,因此压缩机的功率输入。本文介绍了植物特性的结果,因为它是当前操作,以及为工厂的各种计划升级的设备模拟的结果。立即升级包括与负载扩展所带来的变化。随后的升级将涉及扩展5和6的调整,以提高它们的效率。本文综述了设备效率的预期改善,并在压缩机功率的整体降低。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号