(598518) ASARCO LLC HAYDEN CONVERTER RETROFIT PROJECT - AN UPDATE

机译:(598518)Asarco LLC Hayden转换器改装项目 - 更新

获取原文

摘要

ASARCO LLC (Asarco) Hayden Copper smelter, in Hayden, Arizona, has operated continuously (except for minor labor and economic curtailments) since 1912. The current plant configuration comprises INCO flash smelting, Peirce Smith (P-S) converting and fire refining/anode casting. In order to comply with the U.S. Environmental Protection Agency (EPA) 1-hour National Ambient Air Quality Standards (NAAQS) for sulfur dioxide promulgated in June 2010, the Hayden smelter had to increase overall sulfur fixation from approximately 95 % to 99+ %, requiring a retrofit of the existing converter department and upgrade of associated emissions controls systems. The Converter Retrofit Project (CRP) involved replacing the five existing 13' diameter Peirce-Smith converters (2 blowing, 2 hot standby) with three new 15' diameter Peirce-Smith converters (1 blowing, 1 hot standby) to allow for more effective process gas capture using the existing acid plant contact section. Significant upgrades were made to the acid plant wet gas cleaning section and converter primary gas handling system to improve capture performance, reliability, and sludge handling. In addition, a new tertiary gas capture system was installed to further minimize fugitive emissions from the converter aisle. The existing furnace tapping ventilation ESP was replaced with a new baghouse to enable at least 50% SO2 removal using high-surface-area dry lime injection, which was also implemented on the existing converter secondary gas baghouse system. The first two converters and all gas handling system improvements were started up in April 2018, and the third converter was brought online in November 2018. This paper presents the regulatory context; genesis and rationale for CRP; detailed description of the project; challenges during commissioning; system improvements implemented, and design considerations made, and systems performance and process optimization achieved since startup.
机译:Asarco LLC(Asarco)Hayden铜冶炼厂,在亚利桑那州海登,自1912年以来连续运营(少量劳动和经济削减除外)。目前的工厂配置包括Inco Flash冶炼,Peirce Smith(PS)转换和消防/阳极铸件。为了遵守美国环境保护局(EPA)1小时的国家环境空气质量标准(NAAQs)在2010年6月颁布的二氧化硫,海登冶炼厂必须从大约95%到99%以上的总硫固定增加,要求现有转换器部门的改造和相关排放控制系统的升级。转换器改装项目(CRP)涉及用三个新的15'直径Peirce-Smith转换器(1吹,1热备用)取代五个现有的13'直径Peirce-Smith转换器(2吹,2个热备用),以便更有效使用现有的酸性植物接触部分处理气体捕获。对酸性湿气体清洁部分和转换器初级气体处理系统进行了显着升级,以提高捕获性能,可靠性和污泥处理。此外,安装了新的叔汽油捕获系统,以进一步最大限度地减少转换器过道的逃逸排放。现有的炉子攻丝通风ESP被新的袋式厅替换为使用高表面积干石灰注射至少50%的SO2去除,这也在现有的转换器二级气囊系统上实施。第一个两个转换器和所有气体处理系统改进于2018年4月启动,第三次转换器于2018年11月在线。本文提出了监管背景; CRP的创世纪和理由;项目的详细描述;调试期间的挑战;实施的系统改进,并设计考虑因素,并自启动以来实现了系统性能和过程优化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号