Challenging Restoration Project of the Columbia Riverbank and Hillside at Teck Cominco Metals Smelter in Trail, British Columbia, Canada

机译:哥伦比亚河岸和山坡挑战的恢复项目在Tech,不列颠哥伦比亚省,加拿大

获取原文

摘要

Teck Cominco Metals Ltd. has operated a lead-zinc smelter in Trail since the late 1800's. A number of attempts to re-vegetate the riverbank have been made; however, these have been met with poor to, at best, moderate success. The hillside below the smelter was divided into four treatment units, and the adjacent riverbank into five treatment sections. Live cuttings used in the soil bioengineering structures were collected locally within the project area near Trail, British Columbia. In the spring and fall of 2006 soil bioengineering structures were installed along the Columbia River. These consisted of brush layers with protective layers and live cutting pockets in rip-rap, as well as brush sills and fascines within a gravel bank. The cuttings that were used consisted of a mixture of Willow, Black Cottonwood, Red-Osier Dogwood, and a small amount of Pacific Willow. Planting was machine-assisted using excavators. During the summer of 2006, survival and growth of the spring-planted structures was assessed as good to excellent. Installation of soil bioengineering structures on two of the hillside units commenced in the fall of 2006, with the exception of two small areas with a slope gradient less than 40% (22~0) that were planted during the spring using an excavator. On slopes gradient greater than 40% (22~0), which is the majority of the hillside, machine-assisted planting was done in the fall using a Schaeff Walking Excavator (Spyder Hoe). On slopes gradient greater than 60% (31~0) the excavator was tethered to a skidder located at the top of the slope. Materials were transported onto the slope using an overhead cable system. The soil bioengineering structures consisted of brush layers using a species mixture of black cottonwood and willow. In combination with the brush layers, a custom soil amendment was utilized to increase soil fertility, retain moisture and regulate pH. Straw wattles were also installed across the slope, designed to act as sediment traps, shortening the slope length to reduce risk of surface erosion leading to rill formation. Survival and growth of the spring and fall-planted areas was generally good, although in areas survival was poor due to soil factors (high salts/contamination). The hillside units were also planted with container type native shrubs and conifer trees. The following spring of 2007 the second and third units were completed and hydro-seeded with native grasses using pulp mill bio solids as mulch. Irrigation system was installed and application of compost tea was carried out in the fall of 2007.
机译:自1800年代后期以来,Teck Cominco Metals Ltd.经营了一条铅锌冶炼厂。已经制造了许多尝试重新植物河岸;然而,这些已经与穷人相遇,最佳,中等成功。井底下方的山坡分为四个治疗单位,以及邻近的河岸分为五个治疗部分。土壤生物工程结构中使用的活切屑在不列颠哥伦比亚省靠近小径附近的项目区内收集。在2006年春季和秋季,土壤生物工程结构沿着哥伦比亚河装安装。这些由带有保护层和RIP-RAP的活切割口的刷子层组成,以及砾石岸内的刷子和毛毡。使用的扦插由柳树,黑色杨杨,红奥西尔山茱萸的混合物组成,以及少量的太平洋柳树。使用挖掘机机械辅助机械辅助。在2006年夏天,春季种植结构的生存和生长被评估为优秀。在2006年秋季开始的两座山坡装置上安装土壤生物工程结构,除了两个小区域,坡度梯度小于40%(22〜0),在春季使用挖掘机种植。在坡度梯度大于40%(22〜0),这是大多数山坡,使用Schaeff行走挖掘机(Spyder Hoe)在秋季完成机器辅助种植。在大于60%(31〜0)的斜率梯度上,挖掘机将挖掘机系在位于斜坡顶部的玻璃器上。使用架空电缆系统将材料运输到斜坡上。土壤生物工程结构由使用黑色杨纸和柳树的物种混合物的刷子层组成。结合刷子层,利用定制土壤修正以提高土壤肥力,保留水分并调节pH。稻草瓦特也安装在坡度上,旨在充当沉积物陷阱,缩短坡度长度,以降低表面侵蚀风险,导致梯级形成。春季和秋季种植地区的生存和生长通常很好,尽管在地区的生存由于土壤因素(高盐/污染),生存率差。山坡机组也被种植着容器型本土灌木和针叶树。在2007年春天的第二个和第三个单元完成并用纸浆轧机生物固体作为覆盖物与天然草进行了水。安装了灌溉系统,并在2007年秋季进行了堆肥茶的应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号