Stormwater runoff quality can be improved permanently by incorporating a wet pool design into a detention facility or by installing a wet pond only design. Practice has shown that 80% of the total suspended solids (TSS) can be removed, for a typical rainfall year, by providing three (3) times the volume of the mean annual stormwater runoff in a properly designed facility. Removal of sediment, which is a pollutant causing high turbidity, also has the effect of removing nutrients, such as phosphorus, which attaches to sediment particles. Otak, Incorporated designed two (2) water quality wet ponds during 2007 for the redevelopment of the 15.8-acre Barbee Mill sawmill into 115 residential lots directly adjacent to Lake Washington in Renton, Washington which is a Seattle, King County, Washington suburb. Stormwater flow control (detention) was not required by the City due to the proximity of the sizable adjacent lake, but Basic Water Quality improvements were required. The North water quality wet pond provides 51,635 cubic feet of water quality treatment volume which is 4 times the expected mean annual storm runoff from the 13.58 acre basin area. Since impervious roof drainage is considered non-pollution generating approximately 2.02 acres of the basin was bypassed around the water quality pond directly to Lake Washington. The South water quality pond provides 11,431 cubic feet of water quality treatment volume which is more than 7 times the expected mean annual storm runoff from the 2.18 acre basin area. Approximately 0.86 acres of the basin was bypassed around the water quality pond directly to Lake Washington since it source was impervious roof drainage. Successful permanent wet pond designs incorporate a normal stilling pool to reduce stormwater runoff energy upon entry into the pool, an inverted outlet pipe to reduce outlet energy, recirculation of standing pool water if the depth is greater than 6 feet to prevent stagnation, at least a 3:1 length to width ratio to promote settling, a tear drop rounded shape to reduce dead zones, maintaining base flow to promote circulation during dry periods, shady shoreline vegetation to reduce thermal heating, an impermeable pond bottom to maintain a permanent pool and are aligned with the summer prevailing winds to encourage circulation. Typical concentrations of the TSS in the area range between 30 and 100 mg per Liter. Successful removal of more than 80% of the TSS is likely since most of the suggested permanent wet pond designs features were incorporated in these ponds.
机译:通过将湿池设计纳入拘留设施或安装湿池仅设计,可以永久地改善雨水径流质量。实践表明,通过提供三(3)倍在适当设计的设施中的平均年度雨水径流量的三(3)倍,可以去除总悬浮固体(TSS)的80%。除去沉积物,污染物导致高浊度,也具有去除营养物质,例如磷的效果,其附着于沉积物粒子。 Otak,公司设计了两(2)个水质湿池塘,2007年,为15.8英亩的Barbee Mill Sawmill进入115位住宅批次,直接毗邻华盛顿州伦顿湖,伦敦华盛顿州的西雅图,金县,华盛顿郊区。该市由于相当宽的湖泊的附近,城市不需要雨水流量控制(拘留),但需要基本的水质改进。北方水质湿池提供51,635立方英尺的水质处理量,这是来自13.58英亩的盆地地区的预期平均风暴径流的4倍。由于不透水屋顶排水被认为是非污染,产生大约2.02英亩的盆地被绕过水质池塘直接绕过华盛顿湖。南水质量池塘提供11,431立方英尺的水质处理量,这些容积超过2.18英亩盆地地区预期的平均风暴径流的7倍。由于IT源不透水屋顶排水,因此大约0.86英亩的水质池塘直接绕过了华盛顿湖。成功的永久湿池设计采用正常的静脉池,以减少进入池中的雨水径流能量,倒出口管以减少出口能量,如果深度大于6英尺以防止停滞,则站立池水的再循环。至少一个3:1宽度比促进沉降,泪滴圆形的形状减少死区,保持碱流动,促进干燥时期的循环,阴暗的海岸线植被减少热加热,不透水底部保持永久性池与夏季普遍风调整,以鼓励循环。区域间的TSS的典型浓度为30至100mg /升。由于大多数建议的永久性湿池设计特征在这些池塘中纳入其中大多数建议的永久湿池设计,因此可能成功地移除了超过80%的TS。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号