首页> 外文会议>Australian Tunnelling Conference >Design Basis and Construction Experience for a Bolt and Shotcrete Lined Tunnel for the Wambo Rail Spur
【24h】

Design Basis and Construction Experience for a Bolt and Shotcrete Lined Tunnel for the Wambo Rail Spur

机译:沃博铁路施工的螺栓和喷射射击隧道设计基础和施工经验

获取原文

摘要

The Wambo Rail Spur located near Singleton, New South Wales, Australia, runs for 14 km linking the Mt Thorley rail loop and running north-west alongside Jerrys Plain Road to the Wambo Coal Mine at Warkworth. A portion of the project is a 260 m long tunnel located where the rail line passes under Jerrys Plain Road. The tunnel has a low cover and is mostly within highly weathered to fresh laminated siltstone interbedded with coal seams, sandstone and conglomerate. This paper presents the design basis and construction methods used to achieve the 100 year design life of the tunnel required by Wambo Coal while also satisfying settlement and vibration limits imposed on Jerrys Plain Road.
机译:Wambo Rail Spur坐落在澳大利亚新南威尔士州新南威尔士州,搭乘14公里,搭配Mt Thorley Rail Loop,沿着Jerrys Plane Road沿着Warkworth的Wambo Coamine搭乘西北部。该项目的一部分是一个260米长的隧道,位于杰瑞斯平原道路下的铁路线路。隧道具有低盖子,主要是高度风化,在嵌入煤层,砂岩和集团嵌入的新鲜层压硅铁晶中。本文介绍了用于实现华盛煤所需隧道所需的100年设计寿命的设计基础和施工方法,同时也满足杰瑞斯平原道路施加的沉降和振动限制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号