首页> 外文会议>IEEE Software Engineering Workshop >An Alternative Method Employing Uses Cases for Early Effort Estimation
【24h】

An Alternative Method Employing Uses Cases for Early Effort Estimation

机译:一种替代方法,采用了用于早期努力估计的情况

获取原文

摘要

Function points are a standard method frequently used to calculate size and to estimate effort in applications. Although it has been used with good results in the development of industrial software, it is still necessary to improve some aspects such as: the time at which the estimation of effort is performed and the margin of error in the effort estimation. In this article an alternative method for early effort estimation based on use cases is presented. Two new alternative notions of size are used for effort estimation: Transactions and Entity Objects. A case study developed in order to compare the estimations obtained with the two methods for actual projects is described. The result shows that by using number of transactions as a notion of size and the Technique Mean Productivity Value to perform the estimation, the current way of estimating effort can be improved.
机译:功能点是经常用于计算大小的标准方法和应用程序中的估算工作。虽然它在工业软件的开发方面已经使用了良好的结果,但仍然有必要改进一些方面,例如:在努力估计估计的时间和努力估算中的误差范围。在本文中,介绍了基于用例的早期努力估算的替代方法。两个新的替代概念用于努力估算:事务和实体对象。描述了一个案例研究,以便比较用两种实际项目方法获得的估计进行了比较。结果表明,通过使用交易数量作为大小的概念和技术意味着执行估计,可以提高估计工作的当前方式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号