首页> 外文会议>Annual Conference of the Canadian Nuclear Society >ENVIRONMENTAL ASSESSMENT PLANNING FOR NUCLEAR NEW BUILD IN CANADA
【24h】

ENVIRONMENTAL ASSESSMENT PLANNING FOR NUCLEAR NEW BUILD IN CANADA

机译:加拿大核新建环境评估规划

获取原文

摘要

Bruce Power's planning process for maintaining or increasing the electricity generated at its Bruce County site includes refurbishing existing reactors and/or constructing new reactors. Successfully completing environmental assessments for refurbishment and new build projects is a key component of the planning process. Completion of an EA within a specified schedule presents particular challenges. The paper describes how Bruce Power is addressing many first-time issues relating to an EA of a new nuclear power station, including: consideration of alternatives, number and design of reactors, cooling water and waste management strategies, and integration with existing facilities. In addition, the approach for successfully communicating with the local community and government organizations is described.
机译:布鲁斯力量维持或增加其布鲁斯县现场产生的电力的规划过程包括翻新现有的反应器和/或构建新的反应器。成功完成对翻新和新建项目的环境评估是规划过程的关键组成部分。在指定的时间表内完成EA呈现出特殊的挑战。本文介绍了布鲁斯权力如何解决与新核电站的EA有关的许多初级问题,包括:考虑反应堆,冷却水和废物管理策略的替代品,数量和设计,以及与现有设施的整合。此外,还描述了与当地社区和政府组织成功沟通的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号