首页> 外文会议>International symposium on UHV standards >Design and construction of UHV DC test base
【24h】

Design and construction of UHV DC test base

机译:UHV DC测试基地的设计与施工

获取原文

摘要

In order to carry out the strategic target of "the west electric power sent over the east ", complete the first ±800kV DC transmission projects in the world, the SGCC has already started on the construction of UHV DC test base in Beijing. This paper introduces the construction meaning and function of the test base. It mainly includes: test transmission line, corona cage, outdoor test site, test hall, pollution and environment test laboratory, electromagnetism environment test site, UHV DC insulator test laboratory and arrester test laboratory. Concerning above-mentioned test facilities, this paper mostly introduce their basic function and main parameter of test apparatus. Appling these test apparatus not only completing the research task of the first ±800kV DC transmission projects, but also providing test means for research of national product of ±800kV DC equipments and ±1000kV DC transmission technology.
机译:为了开展“东方西部电力的战略目标”,完成世界上第一个±800kV直流传输项目,SGCC已经开始北京UHV DC测试基地的建设。本文介绍了测试基地的施工意义和功能。主要包括:测试传输线,电晕笼,户外测试网站,测试厅,污染和环境测试实验室,电磁环境测试网站,UHV DC绝缘子测试实验室和避雷器测试实验室。关于上述测试设施,本文主要引入其基本功能和测试设备的主要参数。应用这些测试设备不仅完成了第一±800kV直流传输项目的研究任务,还提供了研究±800kV直流设备和±1000kV直流传输技术的国家产品的测试手段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号