【24h】

Design and construction of UHV DC test base

机译:特高压直流试验基地的设计与建设

获取原文

摘要

In order to carry out the strategic target of "the west electric power sent over the east ",complete the first ±800kV DC transmission projects in the world, the SGCC has alreadystarted on the construction of UHV DC test base in Beijing. This paper introduces theconstruction meaning and function of the test base. It mainly includes: test transmission line,corona cage, outdoor test site, test hall, pollution and environment test laboratory,electromagnetism environment test site, UHV DC insulator test laboratory and arrester testlaboratory. Concerning above-mentioned test facilities, this paper mostly introduce their basicfunction and main parameter of test apparatus. Appling these test apparatus not onlycompleting the research task of the first ±800kV DC transmission projects, but also providingtest means for research of national product of ±800kV DC equipments and ±1000kV DCtransmission technology.
机译:为了实现“西电东送”的战略目标, 国家电网公司已经完成了世界上第一个±800kV直流输电项目 开始在北京建设特高压直流试验基地。本文介绍了 测试基地的建设意义和功能。它主要包括:测试传输线, 电晕笼,室外测试场所,测试大厅,污染和环境测试实验室, 电磁环境测试现场,特高压直流绝缘子测试实验室和避雷器测试 实验室。关于上述测试设备,本文主要介绍其基本功能。 测试仪器的功能和主要参数。不仅应用这些测试设备 完成第一个±800kV直流输电项目的研究任务,同时提供 用于±800kV DC设备和±1000kV DC国内产品研究的试验手段 传输技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号