Of the 345 km long Taiwan High Speed Rail Project, connecting the cities of Taipei and Kaohsiung, the 23 km alignment on Contract C230 included the construction of 5755 m of shallow mined tunnels ranging from 137 m to 1285 m in length. These nine tunnels were mined using NATM methodology. On September 6, 2002, a collapse occurred in Tunnel T08 that affected approximately 50 m of tunnel. There was little warning. However, the crew was evacuated approximately 45 minutes prior to failure and thus, no injuries or loss of equipment. This paper will discuss the mining methods, jet grouting ground support, and the instrumentation selected for the rehabilitation of the tunnel after the collapse.
机译:在345公里长的台湾高速铁路项目中,连接台北和高雄的城市,合同上的23公里处对齐C230包括建造5755米的浅型隧道,长度为137米至1285米。使用NATM方法开采这些九个隧道。 2002年9月6日,隧道T08发生崩溃,影响大约50米的隧道。有很少的警告。然而,在发生故障之前大约45分钟疏散,因此,没有伤害或损失的设备。本文将讨论采矿方法,喷射灌浆地面支撑,以及在崩溃后选择隧道康复的仪器。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号