首页> 外文会议>Engineers Society of Western Pennsylvania Annual International Bridge Conference >Demolition Study of 300-ft Truss Incorporated in Bridge Replacement Bid Documents
【24h】

Demolition Study of 300-ft Truss Incorporated in Bridge Replacement Bid Documents

机译:桥梁替代投标文件中300-FT桁架拆除研究

获取原文

摘要

To alert prospective bidders of anticipated demolition complexity, reduce bid risk, and minimize the potential for related claims during construction, a study for dismantling a 300-foot truss over the Mahoning River and two active railroad bridges in proximity of high-voltage transmission lines was incorporated in the bridge replacement bid documents including one feasible demolition scheme with crane sizes, configurations, positions, picks, clearances, and shoring/causeway locations.
机译:要提醒预期拆迁复杂性的预期投标人,减少竞标风险,并最大限度地减少在建设期间的相关权利可能的潜力,一项用于拆除张大河上的300英尺桁架的研究以及在高压传输线附近的两个有源铁路桥梁的研究在桥梁替换投标文件中,包括一个可行的拆除方案,具有起重机尺寸,配置,位置,挑选,间隙和支撑/堤道地点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号