The exploitation of Ajopa mineral deposit belonging to AngloGold Ashanti (Iduapriem) at Tarkwa, in the Western Region of Ghana is not seriously considered as a result of perceived unattractiveness of the project due to little study that has been carried out on the project. Pit optimisation was run using the Datamine NPV Scheduler programme. The optimisation parameters that include mining and processing costs used for pit optimization were based on the study carried out over 10 years period of the existence of the mine. Sensitivity analyses were conducted and based on the prevailing gold price the best scenario was selected and subjected to pit design. The designed pit guaranteed additional mine life of 2.4 years based on yearly production mill throughput of 1.2 million tonnes with attractive operating cash cost of 171 dollars/oz. Based on the salient mining key statistics obtained from this study the Ajopa deposit looks very viable under the prevailing economic conditions and the deposit requires immediate exploitation in line with the company's traditional vision to aggressively pursue and grow the mineral industry in Ghana.
机译:由于在项目上进行的较少研究,在加纳西部地区,在加纳西部地区的Anglogold Ashanti(Iduapriem)的剥削属于Anglogold Ashanti(Iduapriem)的剥削,不会受到认真考虑的。使用Datamine NPV调度程序程序运行PIT优化。包括用于坑优化的采矿和处理成本的优化参数基于该研究进行了超过10年的矿井的存在。对敏感性分析进行并基于普遍的黄金价格,最佳场景被选中并进行坑设计。根据年产量吞吐量为120万吨,有吸引量的经营现金成本为171美元/盎司,设计坑等矿山寿命额外的矿山寿命为2.4亿吨。根据本研究获得的突出矿业关键统计,Ajopa押金在普遍的经济条件下看起来非常可行,押金需要立即符合公司传统愿景,以积极追求加纳的矿产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号