ASHTABULA RIVER SEDIMENT REMEDIATION PROJECT: SLURRY TRANSPORT, DEWATERING, DISPOSAL, AND WATER TREATMENT

机译:Ashtabula河沉积物修复项目:泥浆运输,脱水,处置和水处理

获取原文

摘要

In September 2006, contaminated sediment dredging commenced on the Ashtabula River Remediation project under the authority of the Great Lakes Legacy Act. As part of this construction project approximately 382,000 cubic meters of contaminated sediments were hydraulically dredged from the river, transported 4.3 kilometers overland through a double-walled HDPE pipeline with three 500 Hp centrifugal booster pumps, dewatered utilizing geotextile tubes, and disposed of in a TSCA-permitted landfill specifically constructed for this project. Water from the dewatering process was treated through a 19,000 liter per minute water treatment plant, permitted by OEPA and operated under an NPDES permit. Dredging was completed on October 14, 2007. Dredging and processing operations were scheduled to take place on a 24-hours per day, 6 1/2 days per week (scheduled 1/2 day off per week for maintenance). Production during the 2006 dredging season average less than 610 cubic meters per day due to difficulties in the transport, dewatering, and water treatment systems. Upgrades to these systems during the 2006/2007 winter shutdown greatly improve production rates during the 2007 dredging season. Dredging production during the 2007 dredging season averaged over 1,760 cubic meters per day. Technical details and performance characteristics are provided regarding the transport, dewatering, disposal, and water treatment operations. Additionally, the authors discuss lessons learned during the operations that improved performance in the later stages of the project and will inform decision-making on future sites.
机译:2006年9月,受污染底泥疏浚开始大湖遗产法案的授权下的阿什塔比拉河整治工程。作为这种构造项目污染沉积物的近似382000立方米被液压地从河疏浚的一部分,输送4.3公里陆路通过双壁HDPE管道具有三个500马力离心增压泵,脱水利用土工布管,并且在TSCA设置的 - 允许垃圾填埋场建设专门为这个项目。从脱水过程水通过一个每分钟19000升水处理厂处理,通过允许OEPA并操作下NPDES许可证。疏浚完成于10月14日,2007年疏浚和处理操作均定于每天24小时,每周工作6天半(预定1/2一天,每周进行维护)。 2006年疏浚赛季平均在生产过程中小于610立方米每天由于交通水处理系统的困难,脱水和。 2006/2007冬季停机期间升级这些系统大大提高在2007年疏浚赛季生产率。在2007赛季的清淤疏浚产量平均每天超过1760立方米。关于运输,脱水,处置和污水处理业务提供了技术细节和性能特点。此外,作者讨论的操作,在项目和后期改进的性能将通知决策对未来的网站中吸取的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号