首页> 外文会议>Western Dredging Association Technical Conference >THE NEW YORK AND NEW JERSEY HARBOR: ACHIEVING THE VISION OF A WORLD CLASS HARBOR ESTUARY
【24h】

THE NEW YORK AND NEW JERSEY HARBOR: ACHIEVING THE VISION OF A WORLD CLASS HARBOR ESTUARY

机译:纽约和新泽西港:实现世界级港口河口的愿景

获取原文

摘要

Work is underway by the U.S. Army Corps of Engineers and The Port Authority of New York & New Jersey on a $2.2 billion project to deepen the channels in the Port of New York and New Jersey to depths to 15.2 meters (50 feet) below mean low water. The deepened channels will accommodate the new fleet of post Panamax container ships, and will result in significant transportation cost savings. The project Benefit to Cost ratio is greater than 3 to 1. As the largest Port on the East Coast of the United States, the Port of New York and New Jersey is a key economic engine and contributes more than 230,000 jobs, $10 billion in wages and $22 billion in sales to the regional economy. The project presents some significant dredging, navigation, and logistical challenges, with multiple dredging contracts needing to co-exist with a very active and busy port. The channel bottom is also highly variable and includes significant amounts of hard bedrock that requires drilling and blasting, as well as softer rock, glacial tills and hard clays that can be dug with large excavators. There are also contaminated sediments that have strict environmental compliance and treatment requirements. A key component of the project has been the development of a common vision of a "World Class Harbor Estuary" among the various port interest groups and stakeholders. In addition to the channel improvements, this vision includes a commitment by the Port interests to utilize sound environmental planning and to develop a Comprehensive Port Improvement Plan that looks at the potential infrastructure needs through the year 2030 with the deepening project in place. The vision also includes the commitment to beneficially utilize all of the materials dredged, and to actively promote habitat restoration and enhancement throughout the Harbor Estuary. The challenge is to develop consensus among the many stakeholders during times of tight budgets and constrained funding.
机译:美国陆军的工程师和纽约州港务局正在进行工作,纽约州和新泽西州的港务局加深了纽约港和新泽西港的渠道,深入到15.2米(50英尺)以下意义下跌水。加深的渠道将容纳PANAMAX集装箱船的新舰队,并将节省重大运输成本。该项目效益为成本比率大于3至1.作为美国东海岸最大的港口,纽约港和新泽西港是一个关键的经济引擎,贡献超过230,000件职位,工资100亿美元和区域经济销售额为220亿美元。该项目提出了一些显着的疏浚,导航和后勤挑战,具有多种疏浚合同,需要与非常有效和繁忙的港口共存。通道底部也是高度变化的,并且包括大量的硬质泡杆,需要钻孔和爆破,以及可以用大挖掘机挖出的较软的岩石,冰川耕地和硬粘土。还有污染的沉积物,具有严格的环境依从性和治疗要求。该项目的一个关键组成部分是在各港口群体集团和利益攸关方中发展“世界级港口”的共同愿景。除了渠道改进之外,这种愿景还包括港口利益的承诺,利用健全的环境规划,并开发综合港口改善计划,通过加深项目到位,通过2030年代来看待潜在的基础设施需求。愿景还包括有利地利用疏浚所有材料的承诺,并积极促进整个港口河口的栖息地恢复和增强。挑战是在紧缩预算和受限制的资金期间在许多利益攸关方之间开展共识。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号