首页> 外文会议>International Conference on Computer Applications in Shipbuilding >SIMULATION MODEL FOR PROJECT DURATION ESTIMATION CONSIDERING IMPACTS OF DELAY AND REWORK
【24h】

SIMULATION MODEL FOR PROJECT DURATION ESTIMATION CONSIDERING IMPACTS OF DELAY AND REWORK

机译:考虑延迟和返工影响的项目持续时间估计模拟模型

获取原文

摘要

A simulation model combined with certain parameters extracted from past data is proposed in this paper. To provide a possible solution dealing with the above-mentioned difficulty, we set up a protocol to extract uncertainty parameters from past log data and propose a new simulation model based on extracted parameters. After inputting task dependency and resource information as well as the past data, the project duration will be output, giving feedback to the design of human resource. The proposed protocol includes a definition of necessary past data and how to calculate minimum work amount, delay and rework probability, while the proposed simulation model includes basic model describing project structure, delay model describing variation of task work amount, and rework model describing transition among different tasks. Multiple simulation results are output and different human resource strategies are evaluated based on the results.
机译:本文提出了一种与从过去数据中提取的某些参数结合的仿真模型。为了提供处理上述难度的可能解决方案,我们设置了一种协议,以从过去的日志数据中提取不确定性参数,并提出基于提取的参数的新仿真模型。在输入任务依赖关系和资源信息以及过去的数据之后,将输出项目持续时间,向人力资源的设计提供反馈。所提出的协议包括所需的过去数据的定义以及如何计算最小工作量,延迟和返回概率,而所提出的仿真模型包括描述项目结构的基本模型,描述任务工作量变化的延迟模型以及描述转换的返工模型不同的任务。输出多种仿真结果,并根据结果评估不同的人力资源策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号