首页> 外文会议>ALTA Nickel/Cobalt Conference >METALLURGICAL DEVELOPMENT OF THE NQRTHMET DEPOSIT OF POLYMET MINING FOR RECOVERY OF COPPER, NICKEL, COBALT AND PRECIOUS METALS
【24h】

METALLURGICAL DEVELOPMENT OF THE NQRTHMET DEPOSIT OF POLYMET MINING FOR RECOVERY OF COPPER, NICKEL, COBALT AND PRECIOUS METALS

机译:冶金矿床冶金开发铜,镍,钴和贵金属矿床矿床

获取原文

摘要

The NorthMet project of PolyMet Mining is well advanced and ready to proceed to construction upon receipt of key permits. The NorthMet project will begin with an initial phase of separate copper and nickel concentrate production for sale followed by commissioning of the hydrometallurgical circuit for bulk concentrate leaching. The PLATSOL~(TM) process will be used for the treatment of the concentrate. The PLATSOL~(TM) process will dissolve all the metals of value to high levels of extraction in an autoclave, followed by a series of precipitation and SX/EW processes for recovery of final metal products. The final products from the commercial plant will include; Copper Cathode of LME Grade A Quality; Au and PGM Precipitate for Toll Processing; Mixed Hydroxide Product Containing Ni-Co-Zn; Synthetic Gypsum; The current design basis is for 32,000 short tons of ore per day to be processed through the refurbished Erie plant and a new hydrometallurgical refinery for metal extraction. Figure 10 shows how the hydrometallurgical plant will be integrated with the existing Erie facility.
机译:POLYMET矿业NorthMet项目进展顺利,并准备在收到密钥允许继续施工。该NorthMet项目将与单独的铜和镍精矿生产销售的初始阶段开始,随后为散装精矿浸出湿法冶金电路的调试。所述PLATSOL〜(TM)工艺将用于浓缩物的治疗。所述PLATSOL〜(TM)工艺将溶解的值来在高压釜中高水平的提取所有的金属,随后是最终的金属制品回收的一系列沉淀和SX / EW过程。从商业工厂的最终产品将包括: LME尺寸的铜阴极质量; Au和pgm沉淀用于损害处理;混合氢氧化物产品含镍 - 钴 - 锌;合成石膏;目前的设计基础是32000短吨每天矿石通过翻新伊利植物进行处理和新的湿法冶金精炼厂用于金属萃取。图10显示了如何湿法厂将与现有的伊利工厂进行整合。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号