The State of Utah's Department of Natural Resources funded two projects in Salt Lake City to demonstrate the feasibility of the Continuous Commissioning(R) (CC(R))1 process. The two sites selected were a modern state building, the Matheson Courthouse [1], and a very old building, the South City campus of Salt Lake Community College [2]. This paper describes the measures and latest savings results from the CC(R) process at the Community College. The energy savings amounted to 15% of the annual utility bill. While most of the savings were attributed to CC, part was attributed to the on-site facility operators who implemented measures over and above those recommended by the CC engineers. It was an exciting team effort and a good example of the savings that can be achieved by CC engineers working closely with a good facility operations staff.
展开▼