Continuous Commissioning of Salt Lake Community College South City Campus

机译:盐湖社区学院南城校区连续调试

获取原文
获取原文并翻译 | 示例
       

摘要

The state of Utah's Department of Natural Resources funded two projects in Salt Lake City to demonstrate the feasibility of the continuous commissioning~® (CC~®) process. The two sites selected were a modem state building, the Matheson Courthouse, and a very old building, the South City campus of Salt Lake Community College. This article describes the measures and savings results from the CC~® process at the community college. The energy savings amounted to 15 percent of the annual utility bill. While most of the savings were attributed to CC, part was attributed to the on-site facility operators who implemented measures over and above those recommended by the CC engineers. It was an exciting team effort and a good example of the savings that can be achieved by CC engineers working closely with a good facility operations staff.
机译:犹他州自然资源部资助了盐湖城的两个项目,以证明连续调试(CC〜)过程的可行性。选择的两个地点是一幢现代的国家建筑,即Matheson Courthouse,以及一栋非常古老的建筑,即盐湖社区学院的南城校园。本文介绍了社区学院CC〜®流程的措施和节省的结果。节能量占年度水电费的15%。虽然大部分节省是由于CC,但一部分归因于现场设备操作员,他们实施的措施超出了CC工程师的建议。这是令人兴奋的团队努力,也是CC工程师与优秀的设施运营人员紧密合作可以节省成本的一个很好的例子。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号