HYDROMET AT SEPON

机译:在Sepo的Hydomet.

获取原文

摘要

The commissioning and ramp up phase of the Sepon Copper Project has proved very successful. Design copper production rates have been attained within 12 months of operation and the budget production target for 2005 was achieved. The majority of the process unit operations in the Sepon flowsheet including those described in detail in this paper are now operating at or very close to design levels. The process chemistry has shown to be robust with design copper recoveries being achieved by the process plant and high quality copper cathode being produced. As is expected in the first year of operation there has been some variability in plant performance primarily due to plant availability issues. Current operational challenges include developing consistency in plant performance and driving efficiency improvements in the process. Development and training of the Lao workforce both technical and operational is an additional priority for the Sepon operation.
机译:副铜项目的调试和增速阶段已经证明非常成功。设计铜生产率已在运营12个月内实现,2005年预算生产目标是实现的。 Sepon Flowsheet中的大多数过程单元操作包括本文中详细描述的那些现在在设计层面上运行或非常接近设计。该过程化学表明,通过生产植物和生产的高质量铜阴极实现设计铜回收的稳健。正如预期在第一年的操作中,植物性能的某种可变性主要是由于植物可用性问题。目前的业务挑战包括在工厂的植物性能和驾驶效率的改进中开发一致性。老挝劳动力的开发和培训技术和运营都是省份运营的额外优先事项。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号