Rules of Thumb, Back of the Envelope and Little's Law

机译:拇指规则,信封后面和小法律

获取原文

摘要

Performance analysis starts on "Day 1" of the project. There are some "rules of thumb" that can be used to start estimating the performance and to determine a "resource budget" for the components (how much can be spent to process a unit of work). There are some simple "back of the envelope" calculations that can be done (and should be continuously recalculated throughout the life of the project) that will provide targets against which the software can be tested as soon as the developer has a working copy in unit testing. This paper outlines some of the techniques that the author has found valuable in doing performance analysis for the last 35 years. There is nothing unique about these techniques, but they can be applied to all types of systems from computer systems to call centers to inventory management in a factory and to barbershops. These are techniques that everyone on the project from the system engineers to the architects to the testers should know how to use.
机译:性能分析从项目的“第1天”开始。有一些“拇指规则”可用于开始估计性能,并确定组件的“资源预算”(可以花费多少处理工作单位)。有一些简单的“信封后面”计算可以完成(并且应该在整个项目的整个寿命中持续重新计算),它将提供在开发人员在单位工作副本时测试软件的目标测试。本文概述了作者在过去35年度进行性能分析方面发现有价值的一些技术。这些技术没有什么是独特的,但它们可以应用于来自计算机系统的所有类型的系统,以呼叫中心到工厂和理发店的库存管理。这些是技术从系统工程师到建筑师到测试人员的项目都应该知道如何使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号