首页> 外文会议>International Astronautical Congress >SPACE EXPLORATION SYMPOSIUM (A3) Mars Exploration - Science, Instruments and Technologies (3B) EXOMARS MISSION 2016 PLANETARY PROTECTION IMPLEMENTATION
【24h】

SPACE EXPLORATION SYMPOSIUM (A3) Mars Exploration - Science, Instruments and Technologies (3B) EXOMARS MISSION 2016 PLANETARY PROTECTION IMPLEMENTATION

机译:太空勘探研讨会(A3)火星勘探 - 科学,仪器和技术(3B)exomars Mission 2016行星保护实施

获取原文

摘要

The ExoMars 2016 mission is an ESA lead mission scheduled for a 2016 launch by a Roscosmos supplied Proton-M/Breeze-M rocket. The system consists of a Trace Gas Orbiter (TGO) which accommodate scientific instruments and an Entry Descent and Landing Demonstrator Module (EDM) that will land in a non-special region of Mars. Thales Alenia Space Italy (TAS-I) is the ExoMars Industrial Prime Contractor, and responsible of the Planetary Protection Implementation to ESA. Landing on Mars requires the implementation of a stringent Planetary Protection plan to ensure that thee level of bioburden contamination to be brought to Mars surface will comply with COSPAR regulation. The project has been categorized by ESA as COSPAR Planetary Protection Category III for the Orbiter, and Planetary Protection Category IVa for the EDM. Planetary Protection requirements are applied according to the mission category. The implementation of the planetary protection requirements for ExoMars comprises restrictions on impact probabilities for flight hardware not intended to directly contact Mars and biological contamination control for the other parts of the spacecraft. On these elements, specific levels of maximum bioburden contamination were allocated to fulfill the PP requirements. The way to be compliant with the allocated values assigned at the bioburden controlled elements was to apply to these flight H/W elements bioburden reduction (sterilization by Dry Heat Microbial reduction) and/or cleaning processes, work in bioburden controlled environments while implementing a well-defined recontamination prevention plan during the AIT/ AIV, and tests campaign and launch site activities until the launch. As the DHMR process could change the material properties and the required functions of the equipment/subsystems comprising materials or combination of them, qualification tests campaign were performed to evaluate their compatibility with the DHMR at the beginning of the project. Planetary Protection activities have begun with the start of flight system manufacturing and assembly. The S- CDR has been successfully closed in October 2014 and the proto-flight model is now under environmental test campaign in TAS test facilities.
机译:exoMars 2016特派团是欧安全息席克赛队,该特派团计划于2016年通过提供质子-M / Breeze-M火箭的Roscosmos推出。该系统由痕量气体轨道(TGO)组成,可容纳科学仪器和入门血统和登陆示范模块(EDM),该模块将降落在火星的非特殊区域。 Thales Alenia Space意大利(TAS-I)是exoMars工业原始承包商,并负责行星保护实施的esa。着陆MARS需要实施严格的行星保护计划,以确保将要带到火星表面的生物污染水平符合Cospar条例。该项目已被ESA分类为轨道推动器的Cospar行星保护类别III,以及EDM的行星保护类别IVA。行星保护要求根据任务类别应用。实施例外的行星保护要求包括对飞行硬件的影响概率的限制,不打算直接接触航天器其他部分的火星和生物污染控制。在这些元素上,分配了最大生物污染的特定水平以满足PP要求。符合Bioburden受控元素分配的分配值的方式是应用于这些飞行H / W因子生物弯(通过干热微生物还原的灭菌)和/或清洁过程,在实施井的同时在生物上的控制环境中工作 - 在AIT / AIV期间定义的重新定义预防计划,并在发布之前测试活动和启动网站活动。由于DHMR过程可以改变材料属性和包括材料或组合的设备/子系统所需的功能,所执行的资格测试活动,以评估项目开始时与DHMR的兼容性。行星保护活动已开始使用飞行系统制造和装配的开始。 S-CDR已成功于2014年10月成功关闭,而PRODO-Flight模型现已根据TAS测试设施的环境测试活动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号