首页> 外文会议>International Astronautical Congress >CANADA AND THE INTERNATIONAL SPACE STATION PROGRAM: OVERVIEW AND STATUS SINCE IAC 2010
【24h】

CANADA AND THE INTERNATIONAL SPACE STATION PROGRAM: OVERVIEW AND STATUS SINCE IAC 2010

机译:加拿大和国际空间站计划:自2010年10AIA的概述和状态

获取原文

摘要

Since meeting in Prague for the IAC 2010, the Canadian Space Station Program has been busy supporting the final assembly stages of the ISS and continuing preparations for the maintenance and utilization phase of the ISS. This paper focuses on the milestones reached and various activities that have occurred in the past twelve months. The Mobile Servicing System has installed several different new modules onto the space station during the three shuttle flights in the past year, which also included the capture and berthing of the second Japanese H-II Transfer Vehicle (HTV-2). In addition to installing new modules, MSS has also performed a variety of station-keeping activities including supporting the critical task of replacing the NASA Pump module. Checkouts of Dextre's functionality were completed and Dextre was declared fully commissioned preparing the way for future robotic station maintenance activities. On the human spaceflight front, Chris Hadfield is currently training for his six month increment scheduled to begin in November 2012. Chris was also selected as ISS Commander for the second part of his stay on the ISS. Utilization of the ISS resources continued with Canadian participation in several experiments carried out onboard the ISS. This paper provides a summary of the Canadian utilization activities. Now that the space shuttle assembly missions have ended, CSA has continued to expand its capability in utilization and robotic maintenance. Along with other ISS partners, CSA is working towards the goal of supporting space station operations beyond 2015 in order to continue to benefit from this unique space based laboratory.
机译:自从在2010年的布拉格会议以来,加拿大航天站计划一直忙于支持国际贷款人的最终装配阶段和持续准备股票的维护和利用阶段。本文重点介绍达到的里程碑和过去十二个月发生的各种活动。移动维修系统在过去一年的三个班车航班期间将多个不同的新模块安装到空间站上,其中还包括第二张日本H-II转移车辆(HTV-2)的捕获和堆积。除了安装新模块外,MS还还执行了各种站保存活动,包括支持更换NASA泵模块的关键任务。结账完成了Dextre的功能,并宣布了Dextre宣布为未来的机器人站维修活动准备途径。在人类航天飞行器前,克里斯·哈菲尔德目前正在训练他的六个月增量,计划于2012年11月开始。克里斯还被选为ISS Simiter的ISS指挥官。利用ISS资源的利用继续加拿大参与国际刑事失证船上进行的几个实验。本文提供了加拿大利用活动的摘要。现在,航天飞机装配任务已经结束,CSA继续扩大其在利用和机器人维护中的能力。与其他ISS合作伙伴一起,CSA正在努力实现2015年以后支持空间站运营的目标,以便继续受益于基于独特的空间实验室。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号